My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:11:26 PM
Creation date
7/11/2017 2:41:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERICAN STRUCTUREPOINT, INC. <br />MANHOUR JUSTIFICATION <br />5/18/2017 <br />South Bend Street One -Way to Two Conversion <br />DESCRIPTION: UTILITY COORDINATION - Main and Sample <br />WORK CLASSIFICATION <br />ESTIMATED TIME <br />Project <br />Manager <br />Senior <br />Engineer <br />Staff <br />Engineer <br />Senior <br />Technician <br />Technician <br />TOTAL <br />UtilIV Coordination Services <br />Prepare & distribute Initial Notices <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />Initial Meeting with Utilities <br />2 <br />2 <br />0 <br />0 <br />0 <br />2 <br />Prepare & distribute existing plans for verification <br />0 <br />0 <br />1 <br />0 <br />1 <br />2 <br />Prepare & distribute preliminary plans <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />Review construction plans for potential utility conflicts <br />0 <br />1 <br />1 <br />0 <br />0 <br />2 <br />Prepare & distribute preliminary final plans <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />Conduct Utility Coordination Meeting <br />0 <br />1 <br />1 <br />0 <br />0 <br />2 <br />Review relocation plans <br />0 <br />2 <br />1 <br />0 <br />0 <br />3 <br />Review written work plans <br />0 <br />1 <br />0 <br />0 <br />0 <br />1 <br />Coordinate with South Bend to issue notice to proceed <br />0 <br />1 <br />1 <br />0 <br />0 <br />2 <br />Review any cost reduction measures proposed by utilities <br />0 <br />1 <br />1 <br />0 <br />0 <br />2 <br />Prepare Utility special provision <br />0 <br />2 <br />1 <br />0 <br />0 <br />3 <br />Prepare utili coordination certification <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />"track utility relocations <br />0 <br />1 <br />1 <br />0 <br />0 <br />2 <br />One Additional Utility Coordination Meeting <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Consultant Coordination <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0 <br />TOTAL HOURS <br />2 <br />12 <br />12 <br />0 <br />1 <br />25 <br />AVERAGE HOURLY RATE <br />$165.26 <br />$145.33 <br />$78.58 <br />$112,14 <br />$75.64 <br />SUBTOTAL <br />$330.62 <br />$1 743.96 <br />$942.96 <br />$0.00 <br />$75.64 <br />$3 093.08 <br />DIRECT COSTS see below <br />$139.10 <br />TOTAL FETE <br />$3,232.18 <br />DIRECT COSTS <br />UNIT COST <br />QUANTITY <br />COST <br />Travel, field checks, office reviews, coordination meetings, etc. <br />$0.535 <br />260 <br />$139.10 <br />Shipping (overnight) <br />$12.00 <br />0 <br />$0.00 <br />Certified Letters <br />$5.00 <br />0 <br />$0.00 <br />TOTAL <br />$139.10 <br />Utility Coordination Page 1 of 1 200901278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.