My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:11:26 PM
Creation date
7/11/2017 2:41:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: South Bend One -Way to Two Way Conversion <br />Description: Road Design - Sample and Main Intersettion <br />Road Design - Manhour Justification <br />02417 <br />WORK CLASSIFICATION <br />ESTIMATED TIME HOURS <br />TOTAL <br />Project <br />Manager <br />Senior <br />Engineer <br />Project <br />En over <br />Staff <br />En ineer <br />Senior <br />Technician <br />Technician <br />Preliminary Field Check Plans 40 % complete) <br />Review Field Survey from Others <br />0 <br />1 <br />0 <br />1 <br />1 <br />0 <br />3 <br />Generate Existing Ground Model <br />0 <br />0 <br />0 <br />0 <br />1 <br />0 <br />1 <br />Plot and Check To olCross Sections <br />0 <br />0 <br />1 <br />1 <br />1 <br />01 <br />3 <br />Develop and check Title Sheet <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />2 <br />Develop and check index Sheet <br />0 <br />0 <br />1 <br />0 <br />1 <br />1 <br />3 <br />Develop Typical Sections <br />0 <br />1 <br />2 <br />2 <br />1 <br />4 <br />6 <br />Level One and Level Two Checklist <br />0 <br />1 <br />0 <br />11 <br />0 <br />0 <br />2 <br />Layout Existing Roadway Alignment <br />1 <br />I <br />I <br />1 <br />0 <br />1 <br />5 <br />Design Preliminary ADA compliant Sidewalk Profile Grades <br />0 <br />1 <br />0 <br />2 <br />0 <br />1 <br />4 <br />Develop Plan & Profile Sheets <br />I <br />I <br />I <br />1 <br />1 <br />0 <br />5 <br />Preliminary bike and Sidewalk Design <br />0 <br />0 <br />0 <br />0 <br />0 <br />01 <br />0 <br />Prelirnin Rigt-of-way detenninations <br />0 <br />1 <br />1 <br />2 <br />0 <br />0 <br />4 <br />preliminary Drainage <br />1 <br />2 <br />2 <br />t <br />0 <br />0 <br />6 <br />Assessment of Drives <br />0 <br />1 <br />1): <br />2 <br />0 <br />0 <br />3 <br />Preliminary MOT Design <br />1 <br />3 <br />4 <br />81 <br />0 <br />0 <br />16 <br />Preliminary Construction Details <br />1 <br />2 <br />4 <br />41 <br />0 <br />4 <br />15 <br />Preliminary Lighting Plans <br />0 <br />0 <br />0 <br />01 <br />0 <br />0 <br />0 <br />Assess Pavement Cores <br />01 <br />l <br />0 <br />0 <br />0 <br />0 <br />1 <br />elimina Pavement Markings <br />0 <br />1 <br />1 <br />1 <br />0 <br />1 <br />4 <br />Preliminary Signing <br />0 <br />0 <br />1 <br />2 <br />0 <br />0 <br />3 <br />Preliminary Quantities <br />0 <br />1 <br />1 <br />4 <br />0 <br />0 <br />6 <br />Preliminary Cost Estimate <br />1 <br />2 <br />1 <br />2 <br />0 <br />0 <br />6 <br />Preliminary Erosion Control <br />0 <br />1 <br />0 <br />2 <br />0 <br />0 <br />3 <br />Attend field Check <br />0 <br />4 <br />0 <br />0 <br />0 <br />0 <br />4 <br />C/ A Plans <br />2 <br />4 <br />0 <br />01 <br />0 <br />0 <br />6 <br />Coordination and Management <br />21 <br />8 <br />0 <br />01 <br />0 <br />0 <br />10 <br />Wepare Submittal Packet <br />01 <br />1 <br />0 <br />1 <br />1 <br />0 <br />3 <br />Subtotal <br />10 <br />38 <br />22 <br />38 <br />7 <br />9 <br />124 <br />Stake 3 Plans 90% complete) <br />Revisions from previous review <br />1 <br />2 <br />21 <br />6 <br />3 <br />3 <br />17 <br />Finalize Title Sheet <br />0 <br />1 <br />0 <br />01 <br />1 <br />0 <br />2 <br />Finalize Index Sheet <br />01 <br />0 <br />1 <br />0 <br />1 <br />0 <br />2 <br />Finalize Typical Sections <br />0 <br />1 <br />1 <br />1 <br />1 <br />0 <br />4 <br />Level One Checklist Complete <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />Final RoadwayAli ent <br />0 <br />1 <br />1 <br />1 <br />1 <br />0 <br />4 <br />Final ADA compliant Sidewalk Profilc Grades <br />0 <br />1 <br />0 <br />2 <br />2 <br />0 <br />5 <br />Final Plan & Profile Sheets <br />1 <br />1 <br />2 <br />2 <br />2 <br />0 <br />8 <br />Final Cross Sections <br />0 <br />2 <br />0 <br />3 <br />3 <br />0 <br />8 <br />Final Bike Lane and Sidewalk Design <br />0 <br />1 <br />1 <br />21 <br />0 <br />0 <br />4 <br />Riph(-Of-WRY Com lete <br />01 <br />1 <br />1 <br />1 <br />0 <br />0 <br />3 <br />Final Drainage Structures <br />0 <br />2 <br />2 <br />2 <br />1 <br />1 <br />8 <br />Final Drive DcAgn <br />0 <br />1 <br />1 <br />2 <br />0 <br />0 <br />4 <br />Rule 5 Pormit <br />1 <br />2 <br />2 <br />2 <br />0 <br />0 <br />7 <br />Final Construction Details <br />2 <br />2 <br />2 <br />6 <br />3 <br />3 <br />18 <br />Miscellaneous Details <br />1 <br />2 <br />2 <br />2 <br />21 <br />0 <br />9 <br />Final MOT Plans andkqgM <br />1 <br />4 <br />2 <br />4 <br />2 <br />2 <br />15 <br />Final Pavement Markings <br />0 <br />2 <br />1 <br />2 <br />0 <br />1 <br />6 <br />Final Erosion Control <br />0 <br />1 <br />1 <br />1 <br />0 <br />0 <br />3 <br />Finalize Tables <br />0 <br />1 <br />0 <br />1 <br />1 <br />0 <br />3 <br />Final Quantities <br />0 <br />1 <br />1 <br />8 <br />0 <br />0 <br />10 <br />Final Cost Estimate <br />0 <br />1 <br />2 <br />2 <br />0 <br />0 <br />5 <br />Final Contract Specifications and Book <br />0 <br />2 <br />2 <br />41 <br />0 <br />01 <br />8 <br />C! APIans <br />2 <br />6 <br />0 <br />0 <br />0 <br />0' <br />8 <br />Coordination and Management <br />2 <br />8 <br />0 <br />0 <br />0 <br />0 <br />10 <br />Prepare Submittal Packet <br />01 <br />1 <br />1 <br />1 <br />0 <br />0 <br />3 <br />Subtotal <br />11 <br />47 <br />28 <br />56 <br />23 <br />to <br />175 <br />Final Plans 100% Complete. <br />Revisions from previous review <br />1 <br />2 <br />4 <br />4 <br />4 <br />0 <br />15 <br />Final QC/A Plans and Design <br />2 <br />8 <br />0 <br />0 <br />0 <br />0 <br />10 <br />Submit Final Packa e <br />0 <br />4 <br />4 <br />4 <br />0 <br />4 <br />16 <br />0 <br />Subtotal <br />3 <br />14 <br />8 <br />8 <br />4 <br />4 <br />41 <br />Subtotal <br />24 <br />99 <br />58 <br />102 <br />34 <br />23 <br />340 <br />Page 1 201101043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.