My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:18:24 PM
Creation date
5/24/2017 1:44:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. PennitUng <br />The pretreatment staff assesses (lie information supplied by a user in its permit application. Discharge parameters <br />to be monitored are set based on application information and local requirements, and limits are set in accordance <br />with local, state, and federal regulations. The industrial wastewater discharge permit is issued by the South Bend <br />Board of Public Works. <br />C. Monitoring <br />Monitoring consists prunarily of the following items: <br />1. Periodic Compliance Reports submitted to the City of South Bend pretreatment staff as described in each <br />permitted user's discharge pern-i it. <br />2. Control Authority (City of South Bend) monitoring including site inspections, and sample collection and analysis. <br />Monitoring events will be conducted both with. and without anh.ouncement. <br />3. Compliance report submitted to the City of South Bend pretreatment stall as described in each permitted user's <br />discharge pern.it. <br />4. Other information and reports that convey compliance status which the City of South. Bend pretreatment staff <br />may request. <br />D. Field Inspection and Analysis <br />The City of South Bend pretreatment stall collect wastewater discharge samples and inspect industries as required <br />to determine compliance, and to obtain verification of self monitoring data. <br />E. Compliance Decisions and Enforcement <br />Industries found to be out of compliance with federal state, or local requirements are subject to the conditions <br />found in Chapter 17 of the South Bend Municipal Code, described in this Enforcement Response Plan. Informal <br />enforcement actions, letters of violation, administrative fines, and administrative orders are conducted by a <br />Pretreatment Coordinator or by the Director of Environmental Services, depending on the severity of the <br />noncompliance. Enforcement actions which require legal action, criminal investigation, sewer ban, or other <br />penalties may be made by the Board of Public Works upon the recommendation of the Director of <br />Environmental Services. <br />It. Enforcement Response <br />Violations and discrepancies that have been identified are evaluated by the City of South Bend pretreatment staff <br />as to the type of enforcement response necessary. In order to ensure equitable treatment of violators and provide <br />a stronger basis for selection of appropriate responses to violations, the following Enforcement Response Plan <br />should normally be followed. However, certain circumstances or types of violations may require responses that <br />deviate from this plan. <br />The Enforcement Response Plan indicates the type of noncompliance, the circumstances which might vary the <br />type of response and the range of responses for that particular category of noncompliance. The Enforcement <br />Response Plan .has been developed with the intention of serving die following purposes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.