My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - New Carlisle and St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - New Carlisle and St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:17:47 PM
Creation date
5/24/2017 1:41:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. The permittee shall notify the Control Authority immediately if any changes <br />occur at the facility that affect the potential for a slug or accidental discharge. <br />Additionally, the permittee shall submit a revised plan that reflects those changes. <br />4. Once submitted, the Accidental Discharge/Slug Control Plan shall be deemed an <br />enforceable part of the permit and shall be implemented as written. Any deviation <br />from the Accidental Discharge/Slug Control Plan shall constitute a permit <br />violation. <br />F. Certified Operator Requirement: <br />1. As required by Section 17-10 (o) (4) (b) of the South Bend Municipal Code: <br />St. Joseph Energy Center <br />Water Treatment Facility <br />54745 Walnut Road <br />New Carlisle IN 46552 <br />(Hereafter "permittee") shall be required to have a Certified Industrial Wastewater <br />Operator of the State of Indiana with the minimum classification listed below, sign <br />all periodic compliance reports, 90 day compliance status reports, all compliance <br />schedule reports, and all corrective actions related to an effluent limitations <br />violation. <br />Industrial Certified Operator Classffacation: A -SO <br />The Certified Operator shall sign one of the following statements: <br />"Pretreatment Standards and Requirements are being met on a consistent <br />basis." <br />Or <br />"Pretreatment Standards and Requirements are not being met on. a <br />consistent basis. Additional operation and maintenance and/or additional <br />pretreatment is required to meet the Pretreatment Standards and <br />Requirements." <br />2. If a certified operator is not signing permittee's user compliance reports, a <br />$500.00 fine will be assessed followed by a $500.00 fine for every un-signed user <br />report submitted, until the certified operator requirement is met. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.