My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - New Carlisle and St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - New Carlisle and St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:17:47 PM
Creation date
5/24/2017 1:41:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Grab Sample — A single sample collected from a waste stream without regard to <br />the flow in the waste stream and over a period of time not to exceed fifteen (15) <br />minutes and taken at a time representative of normal discharge. <br />3. Continuously — The permittee shall monitor the discharge flow continuously and <br />submit totalized daily flows with the Periodic Compliance Report (PCR). Each <br />PCR shall include all flow measurements for the entire monitoring period covered <br />in the report. This flow information shall be in addition to the flow data collected <br />during sampling which shall be measured from the start of the sampling event to <br />the end of the sampling event. <br />4. Daily monitoring frequency requires sampling to be conducted one (1) time in <br />each calendar day. <br />5. Weekly monitoring frequency requires sampling to be conducted one (1) time in <br />each calendar week (Sunday to Saturday). <br />6. Monthly monitoring frequency requires sampling to be conducted a minimum of <br />one (1) time per calendar month. <br />7. Semiannual monitoring frequency requires sampling to be conducted a minimum <br />of one (1) time per semiannual period (I" Semiannual period: January — June; 2"d <br />Semiannual period: July — December). <br />8. Quarterly monitoring frequency requires sampling to be conducted a minimum <br />of one (1) time per calendar quarter (I" Quarter: January — March; 2" Quarter: <br />April -- June; 3`d Quarter: July — September; 4ch Quarter: October —December). <br />9. The following conventional pollutants shall incur a surcharge in excess of the <br />stated limitations below, as stated in Section 17-23 (b) of the City of South Bend's <br />Municipal Code. <br />Surcharge for ammonia (NH3-N) >25 mg/L <br />Surcharge for BOD5>250 mg/L <br />Surcharge for phosphorus >10 mg/L <br />Surcharge for Total Suspended Solids (TSS) >250 mg/L <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.