My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 9 - WWTP Secondary Improvements - Project No. 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 9 - WWTP Secondary Improvements - Project No. 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:58:50 PM
Creation date
5/24/2017 1:25:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO.114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-070 (RI) Date: 4/4/17 <br />Submitted in Response to Proposal Request No.: <br />Contract Name and No,: 114-053 South Bend WWTP Secon Ary Ti-eathient lni reventents <br />Contractor:. Thieneman Construction Inc. <br />Subject: COP includes extra electrical costs associated with two area,; of existing electrical <br />conflicts (the first is defined by RFI # 124, and the second is U/G conflicts East of Gallery 4), and <br />one area of existing damaged electrical infrastructure (U/G electrical conduit and junction box East <br />of Gallery 4). See attached T&M tickets from Swaney Electric Company. <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (attach and list supporting information as required) <br />1. Item: Sweney — See attached breakdown - $5,821 <br />2. Item: TCl — PM 2hrs @ $140/hr, PS 2hr @ $110/hr, PE 2hr @ $75/hr, PC Ihr @ $50/hr <br />JUSTIFICATION: <br />1. Item: Unforeseen Conditions/Owner Request <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and <br />Subcontractors, Supplier quotations, and other information required. <br />For the Contract Times, state increase, decrease, or no change to Contract Thnes for Substantial Completion, <br />readiness forfinal payment, and Milestones, if any. If increase or decrease, state specific number ofdays for changes <br />to the Contract Times. <br />Description <br />Amount <br />Contract Times (days) <br />Substantial <br />Final <br />1. Item — Swene + 5% Sub Markup <br />$6,112.00 <br />0 <br />0 <br />2. Item — TO + 15% Mark-up <br />$805.00 <br />0 <br />0 <br />Total This Chart e Order Prn oral <br />$6,917.00 <br />0 <br />0 <br />Changes to Milestones, if any: <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the proposed change. _1_) <br />Change Order Proposal By: Craig Steelb <br />Signature of Proposer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.