My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 9 - WWTP Secondary Improvements - Project No. 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 9 - WWTP Secondary Improvements - Project No. 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:58:50 PM
Creation date
5/24/2017 1:25:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO.114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-040 Rev l Date: 3/14/1-6. <br />Submitted in Response to Proposal Request No.: <br />Contract Name and No.: 114-053 South Bend WWTP Seconds .` Treatment `Improvement s <br />Contractor: Thieneman Construction Inc. <br />Subject: Subsequent to our submission of the combined meter vault, the engineer required 20 feet <br />of ductile iron piping upstream of each of the meters in lieu of RCP piping. The contract <br />documents only require DI inside the vault. We were also directed to provide a pipe support in <br />the vault for each run per the response to RFI #83. Because no supports are shown or specified, <br />this is an additional cost. This revised COP, excludes the costs for the supports, <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (attach and list supporting information as required) <br />1. Item: TCI — See attached breakdown - $6,867 <br />JUSTIFICATION: <br />1. Item: Added Requirements <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and <br />Subcontractors, Supplier quotations, and other information required. <br />For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion, <br />readiness for final payment, and Milestones, if any. If increase or decrease, state specific number of days for <br />changes to the Contract Times. <br />Description <br />Amount <br />Contract Times (days) <br />Substantial <br />Final <br />1. Item — TO <br />$6,867.00 <br />0 <br />0 <br />2. Item — TO — Markup: 5% Subs / 15% TCI <br />$1,030.00 <br />0 <br />0 <br />Total This Change Order Proposal <br />$7,897.00 <br />0 <br />0 <br />Changes to Milestones, if any: <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the proposed change, <br />Change Order Proposal By: Allen Gaatder <br />Signature of Proposer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.