My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 9 - WWTP Secondary Improvements - Project No. 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 9 - WWTP Secondary Improvements - Project No. 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:58:50 PM
Creation date
5/24/2017 1:25:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF UTILITIES <br />TO: Members of the Board of Public Works <br />Eric Horvath, Director of Public Works <br />Michael Schmidt, Board of Public Works Attorney <br />FROM: Al Greek, Director of Utilities <br />Jacob M. Klosinski, Assistant City Engineer <br />SUBJECT: Agenda Request Form — Change Order No. 9 <br />Project No. 114-053: Wastewater Treatment Plant Secondary Treatment <br />Improvements <br />DATE: May 12, 2017 <br />The Division of Utilities is requesting the Board of Public Works approval of Change Order No. 9 <br />for Project No. 114-053 Wastewater Treatment Plant Secondary Treatment Improvements. <br />Refer to attached documents for supporting details for claims. <br />Change Order No. 9 addresses the following changes: <br />COP 40 R1 -- Meter Vault Piping $ 7,897.00 <br />COP 70 R1 — Miscellaneous Electrical Changes $ 6,917.00 <br />COP 71 — Re -use Water Valve $ 920.00 <br />COP 72 — Plug Drains Pipes $ 920.00 <br />COP 73 — Repair Existing 60" RCP at Final Clarifier 7 $ 1,739.00 <br />COP 74 — Final Electrical Allowance Reconciliation $ 8,691.00 <br />NET INCREASE FOR CHANGE ORDER NO. 8 ITEMS $ 27,084.00 <br />Original Contract Sum $11,885,000.00 <br />Net change by previously authorized change orders $ 1,134,600.87 <br />The contract sum prior to this change order $13,019,600.87 <br />By this change order, the project amount increases by $ 27,084.00 <br />The new contract sum including this change order is $13,046,684.87 <br />This Change Order represents a total change of +0.22% <br />Total change for the entire project +9.77% <br />Time Extensions resulting from Change Order No. 9: <br />Substantial Completion: +0 days <br />Final Completion: +0 days <br />The primary funding sources for the construction of this project are the 2011 Sewer Bond (659- <br />0630-415-42-06), 2012 Sewer Bond (661-0630-415-42-06), and Wastewater Equipment <br />Purchases 1 Treatment and Disposal (642-0630-415-43-66). If there are questions regarding the <br />subject change order, please contact Al Greek (Ext. 4210) or Jacob M. Klosinski (Ext. 9496) at <br />the Division of Utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.