My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:35:40 PM
Creation date
5/24/2017 1:23:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ozinge Ready mix Concrete, Inc. <br />A <br />2341 W. Jefferson Street <br />Plymouth, IN 46563 <br />P 6749362137 F 5749354024 <br />Quote # 21166595 <br />Indiana East Division <br />Customer: HRP CONSTRUCTION, INC. — Project: <br />Calvert Street Lift Station Replacement (116-053) <br />Attention: Joe Quote Date: <br />12/06/2016 <br />Address_- _._ Calvert Street --_ ---_—� quoted By: <br />Kent Bowman--- <br />-- <br />_ Sales Phone: <br />_ _.._ .. _ ._..., ...._ ..._ ...... ...__-..._-_ .._. - ..._..__.._._,..__._ <br />-� <br />_ -- — <br />(574) 930-0787 <br />_. _.._...... _._. <br />SOUTH BEND Indiana Sales Email: <br />_...-., .........._..._..,..,...... - ........ . <br />KentBotvman@ozinga.com <br />Job PO: Estimated Yards: <br />300 <br />u <br />1045-11N 2000 PSI LIMESTONE <br />perCYD <br />3636 400D PSI INDOT CLASS A <br />$98.00 i per CYD <br />1065-1 MR 4500 PSI LIMESTONE W/ MRWR <br />per CYD <br />1239 4000 PSI GROUT <br />i per CYD <br />3631 _-_-- -5000 PSI INDOT CLASS C i <br />perCYD <br />369BM3 ; FLOWABLE FILL <br />...,-.-.._.............._...___....._.............._._............--.,-., ..._.....__-_..-_---_ '......_._._-._...-..-._..f•----..._..._.._._..---_.._.__i.__......_._._....__..............._._.. <br />._er -- --- - — <br />i perCYD <br />Environmental Charge $3.00 per CYD <br />awa <br />**ss <br />Straight Bag Mixes (Additional) $4.00 per CYD i [Squid Calcium Chloride <br />�i <br />$4.00 per% per CYD <br />-� — <br />Integral fiber - Fibermesh $8.00 per CYD Not Weather Coaling <br />$25.00 per CYD <br />Minimum Load Charge <4CY $100 NCA (Non Chloride Accelerator) 56.50 per b per CYD <br />_...__... ------._.._.. - ....._j.... ............_.........__.... _—..._...-— --_._.__.� .... <br />Overtime Delivery (plant charge may apply) $10,00 per CYD ! Saturday Delivery <br />S80.0 per Load ' <br />Integral Fiber- Stealth $7,00 per CYD I High Range Water Reducer <br />S5,00 per LYf? <br />-. . <br />Waiting Time -after 60 minutes $2.50 per Minute <br />_....— - - -... _ _...-.......__-_,_g..- <br />I.. <br />Fuel Surchar e A fuel surcharge will be effective when t <br />9 he rice of diesel fuel exceeds $3.7 <br />_..--_.___-p <br />._�....._ _.-_--......_._ ._. <br />5per gallon, Ask your salesman for details. <br />WioonterrNyService I $8.00 per CYD from Nov 01 to Mar 31 <br />— <br />aa <br />W <br />`'�'x - I a -•ba e <br />Prices firm through: 06130/2017 Escalation Date: 07101lZ417 Escalation Arne $5.00 per CYD <br />Escalation Firm Through: 12/31l2017 <br />HOURS OF OPERATION: MON-FRI 6:00 AM - 5:00 PM SAT 6:00 AM -12:00 PM <br />s Tr s g <br />Any unpaid Satance at 45 days may have Bens placed to secure payment -All prices on quote are applicable if used. Taxes not included. Prices subject to change after 60 days. Payment <br />Terms: Net 30 (outstanding balances shall incur a tate payment fee of 1.5% per month). Dzinga does not warrant the performance of concrete which is not adequately cured, Is improperly <br />handled and/or finished. Tests for slump and air content shall be made in accordance with procedures listed in the current ASTM C94 and by certified field inspectors. Any water added shell <br />be at Customer's risk. Ozinga will always strive to deliver materials in a timely manner but at times delays may occur. 0zinga will not accept back charges for service issues. This quote is <br />solely for the Customer's own Internal use and Is not to be published or disseminated to any third party. <br />Signature. <br />Date: <br />@20$6 Ozinga Ready Mix Concrete, Inc. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.