Laserfiche WebLink
Contractor's Bid for Public Work - City of South Bend <br />Project No. 115-097 <br />Addendum No. 02 <br />April 2017 <br />111. <br />TESCO Combination Cabinet on Existing Foundation <br />1 <br />EACH <br />8,152.61 <br />$8,152.61 <br />112. <br />4-1/c No. 4 Copper Cable <br />6,570 <br />LFT <br />6.39 <br />$41,982.30 <br />113, <br />2" PVC Schedule 80 for Lighting <br />5,790 <br />LFT <br />6.61 <br />$38,271.90 <br />114. <br />2" PVC Schedule 80 for Lighting, Directionally Drilled <br />475 <br />LFT <br />11.02 <br />$5,234.50 <br />115. <br />Light Pole Foundation <br />51 <br />EACH <br />683.06 <br />$34,836.06 <br />116, <br />Light Pole and Luminaire, LED, Type 1, Furnish <br />2 <br />EACH <br />5,398.35 <br />$10,796,70 <br />117. <br />Light Pole and Luminaire, LED, Type 2, Furnish <br />8 <br />EACH <br />8,152.61 <br />$65,220,88 <br />118. <br />Light Pole and Luminaire, LED, Type 1, Furnish and Install <br />40 <br />EACH <br />5,772.93 <br />$230,917.20 <br />119. <br />Light Pole and Luminaire, LED, Type 2, Furnish and Install <br />11 <br />EACH <br />8,703,46 <br />$95,738.06 <br />120, <br />Lighting Handhole <br />2 <br />EACH <br />839.50 <br />$1,679.00 <br />121. <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />9,276.35 <br />$9,276.35 <br />122. <br />Drilled Shaft Foundation Type B <br />1 <br />EACH <br />4,406.81 <br />$4,406.81 <br />123. <br />Signal Cantilever Structure and Mast Arm 35', Install <br />1 <br />EACH <br />1,542.38 <br />$1,542.38 <br />124. <br />Traffic Signal Head, 3 Section, 12 IN <br />1 <br />EACH <br />991.53 <br />$991.53 <br />125. <br />Traffic Signal Head, 3 Section, 12 IN, Relocate <br />1 <br />EACH <br />495.77 <br />$495.77 <br />126. <br />Traffic Signal Head, 5 Section, 12 IN, Relocate <br />1 <br />EACH <br />716.10 <br />$716.10 <br />127. <br />Traffic Signal Handhole <br />1 <br />EACH <br />1,211.87 <br />$1,211.87 <br />128. <br />Signal Wire, 5c/14 <br />425 <br />LFT <br />2.20 <br />$935.00 <br />129. <br />Signal Wire, 7c/14 <br />235 <br />LFT <br />3.31 <br />$777.85 <br />130. <br />2" PVC Schedule 80 for Signal Wiring, Directionally Drilled <br />180 <br />LFT <br />12.12 <br />$2,181.60 <br />131. <br />Painting Traffic Signal Equipment <br />1 <br />EACH <br />1,542.38 <br />$1,542.38 <br />132, <br />Sheet Sign, 0.080 in. <br />1 <br />EACH <br />60.59 <br />$60.59 <br />133, <br />Tree, Greenspire Linden, 2.5" <br />1 <br />EACH <br />859.33 <br />$859.33 <br />134. <br />Sign Post, Square, Type 2, Reinforced Anchor Base <br />70 <br />LFT <br />13,22 <br />$925.40 <br />135. <br />Pavemet Markings, Remove <br />700 <br />LFT <br />1.10 <br />$770.00 <br />136. <br />Line, Epoxy, Solid, White, 4" <br />340 <br />LFT <br />1.10 <br />$374,00 <br />137. <br />Line, Epoxy, Solid, Yellow, 4" <br />3,460 <br />LFT <br />1.10 <br />$3,806.00 <br />138. <br />Line, Epoxy, Solid, White, 6" <br />930 <br />LFT <br />3.31 <br />$3,078.30 <br />139. <br />Line, Epoxy, Broken, Yellow, 4" <br />422 <br />LFT <br />1.10 <br />$464.20 <br />140. <br />Transverse Line, Preformed Plastic, White, 24", Stop Bar <br />166 <br />LFT <br />13.22 <br />$2,194.52 <br />141. <br />Pavement Message Marking, Preformed Plastic, Lane <br />Indication Arrow <br />11 <br />EACH <br />192.80 <br />$2,120.80 <br />142. <br />Pavement Message Marking, Preformed Plastic, Sharrow <br />6 <br />EACH <br />385.60 <br />$2,313.60 <br />143, <br />HMA for Patching <br />140 <br />TON <br />106.08 <br />$14,851.20 <br />144. <br />PCCP, 4" Overlay <br />4,300 <br />SYD <br />30.47 <br />$131,021.00 <br />145. <br />Inserta Valve, 6" <br />1 <br />EACH <br />9,261.45 <br />$9,261.45 <br />Total Amount of Base Bid (items 1 through 146) <br />$3,000,920.75 <br />Bidder's Name: <br />Version 7-31/2015 Contractor's Bid For Public Works-10 <br />