Contractor's Bid for Public Work - City of South Bend
<br />Project No. 115-097
<br />Addendum No. 02
<br />April 2017
<br />111.
<br />TESCO Combination Cabinet on Existing Foundation
<br />1
<br />EACH
<br />8,152.61
<br />$8,152.61
<br />112.
<br />4-1/c No. 4 Copper Cable
<br />6,570
<br />LFT
<br />6.39
<br />$41,982.30
<br />113,
<br />2" PVC Schedule 80 for Lighting
<br />5,790
<br />LFT
<br />6.61
<br />$38,271.90
<br />114.
<br />2" PVC Schedule 80 for Lighting, Directionally Drilled
<br />475
<br />LFT
<br />11.02
<br />$5,234.50
<br />115.
<br />Light Pole Foundation
<br />51
<br />EACH
<br />683.06
<br />$34,836.06
<br />116,
<br />Light Pole and Luminaire, LED, Type 1, Furnish
<br />2
<br />EACH
<br />5,398.35
<br />$10,796,70
<br />117.
<br />Light Pole and Luminaire, LED, Type 2, Furnish
<br />8
<br />EACH
<br />8,152.61
<br />$65,220,88
<br />118.
<br />Light Pole and Luminaire, LED, Type 1, Furnish and Install
<br />40
<br />EACH
<br />5,772.93
<br />$230,917.20
<br />119.
<br />Light Pole and Luminaire, LED, Type 2, Furnish and Install
<br />11
<br />EACH
<br />8,703,46
<br />$95,738.06
<br />120,
<br />Lighting Handhole
<br />2
<br />EACH
<br />839.50
<br />$1,679.00
<br />121.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />9,276.35
<br />$9,276.35
<br />122.
<br />Drilled Shaft Foundation Type B
<br />1
<br />EACH
<br />4,406.81
<br />$4,406.81
<br />123.
<br />Signal Cantilever Structure and Mast Arm 35', Install
<br />1
<br />EACH
<br />1,542.38
<br />$1,542.38
<br />124.
<br />Traffic Signal Head, 3 Section, 12 IN
<br />1
<br />EACH
<br />991.53
<br />$991.53
<br />125.
<br />Traffic Signal Head, 3 Section, 12 IN, Relocate
<br />1
<br />EACH
<br />495.77
<br />$495.77
<br />126.
<br />Traffic Signal Head, 5 Section, 12 IN, Relocate
<br />1
<br />EACH
<br />716.10
<br />$716.10
<br />127.
<br />Traffic Signal Handhole
<br />1
<br />EACH
<br />1,211.87
<br />$1,211.87
<br />128.
<br />Signal Wire, 5c/14
<br />425
<br />LFT
<br />2.20
<br />$935.00
<br />129.
<br />Signal Wire, 7c/14
<br />235
<br />LFT
<br />3.31
<br />$777.85
<br />130.
<br />2" PVC Schedule 80 for Signal Wiring, Directionally Drilled
<br />180
<br />LFT
<br />12.12
<br />$2,181.60
<br />131.
<br />Painting Traffic Signal Equipment
<br />1
<br />EACH
<br />1,542.38
<br />$1,542.38
<br />132,
<br />Sheet Sign, 0.080 in.
<br />1
<br />EACH
<br />60.59
<br />$60.59
<br />133,
<br />Tree, Greenspire Linden, 2.5"
<br />1
<br />EACH
<br />859.33
<br />$859.33
<br />134.
<br />Sign Post, Square, Type 2, Reinforced Anchor Base
<br />70
<br />LFT
<br />13,22
<br />$925.40
<br />135.
<br />Pavemet Markings, Remove
<br />700
<br />LFT
<br />1.10
<br />$770.00
<br />136.
<br />Line, Epoxy, Solid, White, 4"
<br />340
<br />LFT
<br />1.10
<br />$374,00
<br />137.
<br />Line, Epoxy, Solid, Yellow, 4"
<br />3,460
<br />LFT
<br />1.10
<br />$3,806.00
<br />138.
<br />Line, Epoxy, Solid, White, 6"
<br />930
<br />LFT
<br />3.31
<br />$3,078.30
<br />139.
<br />Line, Epoxy, Broken, Yellow, 4"
<br />422
<br />LFT
<br />1.10
<br />$464.20
<br />140.
<br />Transverse Line, Preformed Plastic, White, 24", Stop Bar
<br />166
<br />LFT
<br />13.22
<br />$2,194.52
<br />141.
<br />Pavement Message Marking, Preformed Plastic, Lane
<br />Indication Arrow
<br />11
<br />EACH
<br />192.80
<br />$2,120.80
<br />142.
<br />Pavement Message Marking, Preformed Plastic, Sharrow
<br />6
<br />EACH
<br />385.60
<br />$2,313.60
<br />143,
<br />HMA for Patching
<br />140
<br />TON
<br />106.08
<br />$14,851.20
<br />144.
<br />PCCP, 4" Overlay
<br />4,300
<br />SYD
<br />30.47
<br />$131,021.00
<br />145.
<br />Inserta Valve, 6"
<br />1
<br />EACH
<br />9,261.45
<br />$9,261.45
<br />Total Amount of Base Bid (items 1 through 146)
<br />$3,000,920.75