My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental No. 1 to PSA - Lawson Fisher Assoc. - Olive St Reconstruction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Supplemental No. 1 to PSA - Lawson Fisher Assoc. - Olive St Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:46:04 PM
Creation date
4/13/2017 10:15:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Unit <br />Unit Price <br />ii. Penetration <br />ft <br />$20.00 <br />iii. Pore Water [Dissipation Test <br />hr <br />$260.00 <br />iv. Hydraulic Conductivity and Consolidation <br />ea <br />$79.00 <br />d. Profiling with Shearwave Velocity Measurement <br />ft <br />$22.00 <br />e. Sample <br />ea <br />$33.00 <br />15. <br />Furnishing of a boat <br />Actual Cost <br />16. <br />Barge set-up expenses <br />a. Navigable water <br />i. Barge set-up <br />ea <br />$5,200,00 <br />ii. Rental of support equipment and/or boat <br />Actual Cost <br />iii. Drill rig downtime <br />hr <br />$132.00 <br />b. Non -navigable water barge set-up <br />ea <br />$4,500.00 <br />17. <br />Additional disassembly and reassembly <br />a. Navigable water <br />ea <br />$1,900.00 <br />b. Non -navigable water <br />ea <br />$1,700.00 <br />18. <br />Barge mounted borings with split spoon sampling <br />ft <br />$29.75 <br />19. <br />Barge mounted core drilling <br />ft <br />$40.25 <br />20. <br />Barge mounted boring through bedrock or Moulders <br />ft <br />$44.50 <br />21. <br />Barge mounted soundings <br />ft <br />$17.60 <br />22. <br />Casing through water <br />ft <br />$7.75 <br />23. <br />Uncased sounding through water <br />ft <br />$5.00 <br />24. <br />Set up for borings and machine soundings <br />a. Borings and machine soundings less than 20 ft deep <br />4 ea <br />$64.00 <br />b. Rock core borings <br />ea <br />$110.00 <br />25. <br />Additional 2-in. split spoon sampling <br />ea <br />$19.00 <br />26. <br />3-in. split spoon samples <br />ea <br />$21.00 <br />27. <br />3-in. Shelby tube samples <br />ea <br />$57.00 <br />28. <br />Bag samples <br />a. 300-lb sample <br />ea <br />$105.00 <br />b. 25-lb sample <br />ea <br />$46.00 <br />c 5-lb sample <br />ea <br />$40.00 <br />29. <br />Field vane shear test <br />ea <br />$102.00 <br />30. <br />4'/2-in. cased hole <br />ft <br />$11.30 <br />31. <br />Installation of Geotechnical Instruments <br />a. Inclinometer casing installation <br />ft <br />$13.40 <br />b. Piezometer installation up to 25 ft below surface <br />ea <br />$230.00 <br />c. Piezometer installation deeper than 25 ft below surface <br />ea <br />$260.00 <br />d. Metal protective outer cover for inclinometer and piezometer <br />ea <br />$113.00 <br />casings <br />32. <br />Geotechnical engineer <br />4 hr <br />$105.00 <br />33. <br />Railroad expenses <br />Actual Cost <br />34. Twenty-four hour water levels <br />Total <br />$256.00 <br />$420.00 <br />2of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.