My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental No. 1 to PSA - Lawson Fisher Assoc. - Olive St Reconstruction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Supplemental No. 1 to PSA - Lawson Fisher Assoc. - Olive St Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:46:04 PM
Creation date
4/13/2017 10:15:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Amendment No. 1 <br />Project: Olive Street Reconstruction <br />From Prairie Avenue to 220 ft north of railroad south of Tucker Drive <br />Des. No.: 1400637 <br />This Contract Amendment is made and entered to this Contract between the City of South Bend Board of <br />Public Works (hereinafter referred to as "LPA") and Lawson -Fisher Associates P.C. (hereinafter referred <br />to as "CONSULTANT'). <br />WHEREAS, the LPA and CONSULTANT did February 24, 2015 enter into a Contract for project <br />development services for the above reference project. <br />WHEREAS, the LPA desires that CONSULTANT provide additional services to extend the project <br />south to the intersection of S.R. 23 (Prairie Avenue) and also north to approximately 250 ft north of the <br />railroad tracks and south of Tucker Drive. <br />WHEREAS, the LPA desires the CONSULTANT provide additional services for a reduced <br />roadway section, sidewalk on the east side where viable, lighting design, and other amenities that will <br />require revisions and updates to already completed work at Stage 2 Plan submission. <br />WHEREAS, the LPA desires the CONSULTANT provide additional services for an expansion of <br />the geotechnical investigation for the additional project limits north and south. <br />WHEREAS, the LPA desires the CONSULTANT provide additional services for an expansion of <br />the utility coordination for the additional project limits north and south. <br />WHEREAS the LPA desires the CONSULTANT provide additional services for title and <br />encumbrance reports, right-of-way engineering for the purpose of land acquisition through these project <br />limits. <br />WHEREAS, the LPA desires the CONSULTANT provide additional services for public <br />involvement and conducting a design hearing as part of the environmental documentation. <br />WHEREAS, the LPA desires the CONSULTANT provide additional services for construction <br />phase services as part of project development. <br />WHEREAS, the LPA desires the CONSULTANT to provided additional services to address <br />changes to the road reconstruction, changed project limits, additional walkway on the east side of Olive <br />Street, additional right-of-way required, changes to the environmental documentation as requested and <br />directed; and <br />WHEREAS, in order to provide for completion of the work, it is necessary to amend and <br />supplement the contract in the amount of $271,000.00 <br />NOW, THEREFORE, it is agreed by and between the parties that the following Appendices are <br />amended: <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.