My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:32:57 PM
Creation date
3/31/2017 10:53:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INSURANCE. TAXES 109.04 <br />,TZA:1MA2U719Eel <br />2017 <br />INSURANCE $0.00 (13) <br />TAXES $0.00 (14) <br />TOTAL: LINE (13) + (14) $0.00 (16) <br />10 %x LINE (15) $0.00 (16) <br />GRAND TOTAL FOR INSURANCE, TAXES: LINE (15)+(16) $0.00(17) <br />ATER/AL. 109.04 /c <br />WEEK ENDING: February 9, 2017 <br />MATERIALS PURCHASED: $0.00 (18) <br />MATERIALS MANUFACTURED: $0.00 (19) <br />TOTAL: LINE (18) + (19), $0.00 (20) <br />12 % x LINE (20) $0.00 (21) <br />GRAND TOTAL FOR MATERIALS: LINE (20)+(21) $0.00(22) <br />WEEK ENDING: February 9, 2017 <br />CONTRACTOR OWNED EQUIPMENT <br />BLUE BOOK ADJUSTED <br />MOWHLYRATE1176 <br />HRS <br />BLUE BOOK OPERATING <br />RATEIHR <br />BLUEBOOKTOTAL <br />OOSTPERHOUR <br />HOURS <br />EXTENSION <br />PICK-UP TRUCK 3/4 TON <br />$8.75 <br />WAS <br />$21.23 <br />$0.00 <br />PICK-UP TRUCK 1 TON <br />$9.89 <br />$13.70 <br />$23.67 <br />$0.00 <br />FLATRACK TRUCK <br />$16.66 <br />$16.85 <br />$33.51 <br />$0.00 <br />LOWBOY <br />$47.63 <br />$43.25 <br />$90.88 <br />$0.00 <br />TILT TOP TRAILER <br />$6.50 <br />$2.85 <br />$9.35 <br />$0.00 <br />TRI-AXLE DUMP TRUCK <br />$30.12 <br />$41A0 <br />$79.22 <br />$0.00 <br />QUAD -AXLE DUMP TRUCK <br />$40.59 <br />$42.50 <br />$83.09 <br />$0.00 <br />CX75 EXCAVATOR <br />$45.54 <br />$16.95 <br />$62.49 <br />$0.00 <br />CX210 EXCAVATOR <br />$73.26 <br />$36.10 <br />$109.36 <br />$0.00 <br />CX330 EXCAVATOR <br />$113.85 <br />$59.30 <br />$173.15 <br />$0.00 <br />850DOZER <br />$53.89 <br />$26.30 <br />$80.19 <br />$0.00 <br />SKIDSTEER <br />$26.60 <br />$16.20 <br />$41.80 <br />$0.00 <br />CAST 938 LOADER <br />$42.56 <br />$23.65 <br />$66.21 <br />$0.00 <br />CAT 950 LOADER <br />$56.95 <br />$28.00 <br />$84.95 <br />$0.00 <br />MAINTAINER <br />$41.37 <br />$20.15 <br />$61.52 <br />$0.00 <br />GRADER 12 <br />$55.03 <br />$27.30 <br />$82.33 <br />$0.00 <br />GRADER 140 <br />$61.31 <br />$30.80 <br />$92.111 <br />1 0.00 <br />Dirt Roller <br />$34.95 <br />$22.75 <br />$57.70 <br />$0.00 <br />Asphalt Pave <br />$260.08 <br />$88.45 <br />$366.63 <br />$0.00 <br />Asphalt Distributor <br />$34.70 <br />$8.70 <br />$43.40 <br />$0.00 <br />ROLLER 3-5 TON <br />$78.59 <br />$27A0 <br />$105.69 <br />$0.00 <br />ROLLER 6-12 TON <br />$93.44 <br />$29.10 <br />$122.54 <br />$0.00 <br />AIR COMPERSSOR <br />$19.20 <br />$BA2 <br />$27.32 <br />$0.00 <br />TOTAL CONTRACTOR OWNED EQUIPMENT <br />RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) <br />'PUEL,'LUBRICANTS AND TRANSPORTATION COSTS <br />TOTAL LINES (23) + (24) + (25) <br />12 % x LINE (26) <br />GRAND TOTAL FOR FUUIPMENP LINES-(26) + (27) <br />$t1.00 (23) <br />$0.00 (24) <br />$0.00 (26) <br />$0.00 (26) <br />$0.00 (27) <br />$0:0a (28) <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.