My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:32:57 PM
Creation date
3/31/2017 10:53:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ EP Thf 5 /-?/LEY <br />w.rieti,,, <br />Mr. Myron Cohagan <br />Lochmueller Group <br />130 South Main St. Suite 300 <br />South Bend, IN 46601 <br />RE: EWA 045, St Joe Street Irrigation System <br />February 131h, 2017 <br />The following is the REVISED pricing for the modified irrigation system for St. Joseph Street. <br />During our meeting with the City on February 9' it was determined that the price for the <br />originally designed irrigation system was too costly. As a result Wissco modified the plans in an <br />effort to provide a less expensive system. Approval of the modified drawing will be required by <br />the City prior to the start of this work. <br />Division B: <br />Item # <br />Qty <br />Unit <br />Description <br />Unit Price <br />Total <br />EWA <br />1 <br />LSM <br />St. Joseph Street Irrigation System <br />$47,309.10 <br />$47,309.10 <br />EWA <br />1 <br />LSM <br />St. Joseph Street Irrigation Meter Pit <br />plumbing and Backflow Preventers <br />$16,140.00 <br />$16,140.00 <br />Total: <br />$63,449.10 <br />Attached is all the documentation that supports this pricing. Please let me know if you have any <br />questions or require any additional information. <br />Respectfully, <br />Sc4-1f Ki4-4atvh to <br />Scott Kirkpatrick <br />Estimator/Project Manager <br />Rieth-Riley Constriction <br />25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 <br />
The URL can be used to link to this page
Your browser does not support the video tag.