My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:32:57 PM
Creation date
3/31/2017 10:53:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 33 <br />One- Way to Two -Way Street Conversion <br />Division B — Part 1 <br />Project No. 116-001 <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division B: <br />ADD 1 LSM to Line Item 483: St. Joseph Street Irrigation System, 1 LSM @ $47,309.10 for a <br />total addition of $47,309.10 <br />ADD 1 LSM to Line Item 484: Meter Pit Plumbing and Backflow Preventers @ $16,140.00 for a <br />total addition of $16,140.00 <br />SPECIFICATIONS: <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />The following sheets are issued as new sheets as a part of this Change Order: <br />Sheet 138 to 140 — Added Irrigation Plans and Details <br />END OF CHANGE ORDER NO. 33 <br />Sheet 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.