My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - EPOCH Architecture + Planning LLC - Design of Masonry Restoration on Century Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - EPOCH Architecture + Planning LLC - Design of Masonry Restoration on Century Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:38:45 AM
Creation date
3/16/2017 10:10:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and approvals required by Laws and Regulations or the Contract Documents. Engineer's <br />review of such certificates will be for the purpose of determining that the results certified <br />indicate compliance with the Contract Documents and will not constitute an independent <br />evaluation that the content or procedures of such inspections, tests, or approvals comply <br />with the requirements of the Contract Documents. Engineer shall be entitled to rely on the <br />results of such tests. <br />14. Disagreements between Owner and Contractor: Render formal written decisions on all <br />duly submitted issues relating to the acceptability of Contractor's work or the interpretation <br />of the requirements of the Contract Documents pertaining to the execution, performance, or <br />progress of Contractor's Work; review each duly submitted Claim by Owner or Contractor, <br />and in writing either deny such Claim in whole or in part, approve such Claim, or decline to <br />resolve such Claim if Engineer in its discretion concludes that to do so would be <br />inappropriate. In rendering such decisions, Engineer shall be fair and not show partiality to <br />Owner or Contractor and shall not be liable in connection with any decision rendered in <br />good faith in such capacity. <br />15. Applications for Payment: Based on Engineer's observations as an experienced and <br />qualified design professional and on review of Applications for Payment and accompanying <br />supporting documentation: <br />a. Determine the amounts that Engineer recommends Contractor be paid. Such <br />recommendations of payment will be in writing and will constitute Engineer's <br />representation to Owner, based on such observations and review, that, to the best of <br />Engineer's knowledge, information and belief, Contractor's Work has progressed to the <br />point indicated, the Work is generally in accordance with the Contract Documents <br />(subject to an evaluation of the Work as a functioning whole prior to or upon <br />Substantial Completion, to the results of any subsequent tests called for in the Contract <br />Documents, and to any other qualifications stated in the recommendation), and the <br />conditions precedent to Contractor's being entitled to such payment appear to have been <br />fulfilled in so far as it is Engineer's responsibility to observe Contractor's Work. In the <br />case of unit price work, Engineer's recommendations of payment will include final <br />determinations of quantities and classifications of Contractor's Work (subject to any <br />subsequent adjustments allowed by the Contract Documents). <br />b. By recommending any payment, Engineer shall not thereby be deemed to have <br />represented that observations made by Engineer to check the quality or quantity of <br />Contractor's Work as it is performed and furnished have been exhaustive, extended to <br />every aspect of Contractor's Work in progress, or involved detailed inspections of the <br />Work beyond the responsibilities specifically assigned to Engineer in this Agreement <br />and the Contract Documents. Neither Engineer's review of Contractor's Work for the <br />purposes of recommending payments nor Engineer's recommendation of any payment <br />including final payment will impose on Engineer responsibility to supervise, direct, or <br />control Contractor's Work in progress or for the means, methods, techniques, <br />sequences, or procedures of construction or safety precautions or programs incident <br />thereto, or Contractor's compliance with Laws and Regulations applicable to <br />Page <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500Agraenent Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Sodety of Professional Enginear afor EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.