Laserfiche WebLink
EXHIBIT A <br />Scope of Services <br />General Scope of Services <br />Leeper Park Tank Project Definition Statement <br />The Engineer shall compile a project definition statement for the Leeper Park Storage tank to <br />establish the basis of design: The design of the Leeper Park Tank is scheduled to begin before <br />March first, two thousand and seventeen (3/1/2017). The Engineer will develop a project <br />definition statement by completing the following engineering services tasks: <br />TASK 1: Brief project history and introduction <br />Preparation of the basic definition of the project with respect to needs of the project, location, <br />and impact on the LTCP Phase 2 program. <br />TASK 2: Conceptual Design <br />Development of a Basis of design that includes: <br />Confirmation of the tank size and location <br />Completion of a collection system routing study <br />Determining the tank design components <br />Review of utility co-ordination <br />Completing a preliminary structure layout and cross section figure. <br />Compensation — Lump -Sum: <br />Task1.............................................................$12,500 <br />Task2.............................................................$36,360 <br />TOTAL............................................................ $48, 860 <br />