Laserfiche WebLink
Prepared for: <br />Dustin Waters <br />Truck City <br />2333 W 25th Ave <br />Gary, IN 46404 <br />Phone: 219-949-8595 <br />Trailer Connections <br />Wheelbase & Frame <br />Chassis Equipment <br />RELAY VALVE WITH 5-8 PSI CRACK PRESSURE, <br />NO REAR PROPORTIONING VALVE <br />WABCO SS-1200 PLUS AIR DRYER WITH <br />INTEGRAL AIR GOVERNOR AND HEATER <br />AIR DRYER FRAME MOUNTED <br />STEEL AIR BRAKE RESERVOIRS <br />CLEAR FRAME RAILS FROM BACK OF CAB TO <br />FRONT REAR SUSPENSION BRACKET, BOTH <br />RAILS OUTBOARD <br />PULL CABLES ON ALL AIR RESERVOIR(S) <br />UPGRADED CHASSIS MULTIPLEXING UNIT <br />UPGRADED BULKHEAD MULTIPLEXING UNIT <br />NO HIGH CURRENT TRAILER/BODY CABLE <br />6450MM (254 INCH) WHEELBASE <br />11/32X3-1/2X10-15/16 INCH STEEL FRAME <br />(8.73MMX277.8MM/0.344X10.94 INCH) 120KSI <br />2450MM (96 INCH) REAR FRAME OVERHANG <br />FRAME OVERHANG RANGE: 91 INCH TO 100 <br />INCH <br />CALC'D BACK OF CAB TO REAR SUSP C/L (CA) : <br />188.45 in <br />CALCULATED EFFECTIVE BACK OF CAB TO <br />REAR SUSPENSION C/L (CA) : 185.45 in <br />CALC'D FRAME LENGTH - OVERALL: 379.39 <br />CALC'D SPACE AVAILABLE FOR DECKPLATE : <br />188.45 in <br />CALCULATED FRAME SPACE LH SIDE: 176.05 <br />in <br />CALCULATED FRAME SPACE RH SIDE: 197.66 <br />in <br />SQUARE END OF FRAME <br />FRONT CLOSING CROSSMEMBER <br />STANDARD WEIGHT ENGINE CROSSMEMBER <br />STANDARD MIDSHIP #1 CROSSMEMBER(S) <br />STANDARD REARMOST CROSSMEMBER <br />STANDARD SUSPENSION CROSSMEMBER <br />THREE-PIECE 14 INCH CHROMED STEEL <br />BUMPER WITH COLLAPSIBLE ENDS <br />FRONT TOW HOOKS - FRAME MOUNTED <br />Application Version 8.9.114 <br />Data Version PRL-14M.030 <br />Pyramid Grapple Demo <br />155 <br />L FR£/GHTUN£R <br />Prepared by: <br />Dustin Waters <br />TRUCK CITY OF GARY, INC. <br />2333 W 25th Ave <br />GARY, IN 46404 <br />Phone: 219-949-8595 <br />06/08/2016 11:48 AM <br />Page 8 of 14 <br />