My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Newman Center Masonry Work Project No. 116-132 - C&S Masonry - Awardee
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Newman Center Masonry Work Project No. 116-132 - C&S Masonry - Awardee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:52:02 AM
Creation date
1/12/2017 8:43:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Newman Center: Masonry Repair <br />SB Project No. 116-132 <br />SECTION 03 0130 <br />CONCRETE CLEANING <br />PART 1: GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes <br />1. Cleaning all vertical cast in place concrete walls at building exterior perimeter <br />2. Removing paint from concrete at surfaces. <br />1.3 DEFINITIONS <br />A. Low -Pressure Spray: 100 to 400 psi; 4 to 6 gpm. <br />B. Medium -Pressure Spray: 400 to 800 psi; 4 to 6 gpm. <br />C. High -Pressure Spray: 800 to 1200 psi; 4 to 6 gpm. <br />1.4 SEQUENCING AND SCHEDULING <br />A. Work Sequence <br />1. Remove plant growth <br />2. Inspect for open cracks. Where repairs are required, delay further cleaning work until after <br />repairs are completed, cured and dried, to prevent the intrusion of water and other cleaning <br />materials into the wall. <br />3. Clean concrete surfaces to remove dirt, debris, and stains <br />4. Apply paint stripper to remove paint from surface and wash. <br />5. Final cleaning. <br />1.5 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />1. Include material descriptions and application instructions. <br />2. Include test data substantiating that products comply with requirements. <br />1.6 INFORMATIONAL SUBMITTALS <br />A. Cleaning program. <br />1.7 QUALITY ASSURANCE <br />A. Cleaning Program: Prepare a written cleaning program that describes cleaning process in detail, <br />including materials, methods, and equipment to be used; protection of surrounding materials; and <br />CJNCRETE CLEANING P'aae i 03 01 30 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.