Laserfiche WebLink
delivered as quickly as possible. Stated delivery lead time may be included as an integral <br />part of our bid selection process. FOB Central Services. The unit and all related paperwork is <br />to be delivered to: <br />Central Services Division <br />1045 West Sample Street <br />South Bend, Indiana 46619 <br />All Certificates of Origin/Title Work shall list the owner as: <br />The City of South Bend <br />1045 West Sample Street <br />South Bend, Indiana 46619 <br />The Board will award the bid to the lowest responsible and responsive bidder. If the bid is not <br />awarded to the lowest bidder, the factors used to justify the awards will be stated in writing at the <br />request of any bidder. <br />The Board reserves the right to reject any and/or all bids or portions thereof and to waive any <br />irregularities or informalities. <br />MANUFACTURING PROCESSES AND MATERIALS: Each ES NO <br />rollout container shall consist of a body, lid, wheels, axle, and <br />necessary accessories. The plastic resin material and the finished <br />container must meet the minimum specifications herein. <br />PLASTIC MATERIAL: Base plastic resin must be first quality <br />linear low density polyethylene supplied by a national petrochemical <br />producer. Please list supplier: Novapol Dow <br />Bidder must submit technical data sheet(s) from the resin producer, <br />which verify that the resin to be used in the container body will meet <br />the following minimum property levels: <br />ESCR - > 1000 hrs <br />Elongation - > 1000% <br />Density - 0.937-0.940 <br />RESIN ADDITIVES: The plastic resin must be enhanced with color [YESJ NO <br />pigment and ultraviolet inhibitor, which must be uniformly <br />distributed throughout the finished container. To ensure thorough <br />distribution of these additives, the resin and additives must be mixed <br />in a molted state using a hot -melt compounding process. <br />Bidder must submit a statement certifying that all of the plastic resin <br />and additives will be hot -melt blended. <br />CONTAINER REQUIREMENTS: The rollout containers must be I [YES i NO I <br />10 <br />