Laserfiche WebLink
S. IDNR, IDEM, Rule 5, or USACOE permits of any kind <br />9. Right -of -Way Engineering —No new Right -of -Way anticipated <br />10. Right -of -Way acquisition services —No new Right -of -Way anticipated <br />11. Railroad Coordination <br />12. Storm sewer design <br />13. Sanitary sewer design <br />14. Water main design <br />15. Lighting design <br />16. Design of sidewalks beyond 25 feet from the curb ramps/intersection <br />17. Landscaping or planting design <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with the <br />Project; preparation or review of environmental assessments and impact statements; review <br />and evaluation of the effects on the design requirements for the Project of any such statements <br />and documents prepared by others; and assistance in obtaining approvals of authorities <br />having jurisdiction over the anticipated environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but not <br />limited to, changes in size, complexity, Owner's schedule, character of construction, or <br />method of financing; and revising previously accepted studies, reports, Drawings, <br />Specifications, or Contract Documents when such revisions are required by changes in Laws <br />and Regulations enacted subsequent to the Effective Date or are due to any other causes <br />beyond Engineer's control. <br />4. Services resulting from Owner's request to evaluate additional Study and Report Phase <br />alternative solutions beyond those identified in Paragraph A1.01.A.4. <br />5. Services required as a result of Owner's providing incomplete or incorrect Project <br />information to Engineer. <br />6. Providing renderings or models for Owner's use. <br />7. Undertaking investigations and studies including, but not limited to, detailed consideration <br />of operations, maintenance, and overhead expenses; the preparation of financial feasibility <br />and cash flow studies, rate schedules, and appraisals; assistance in obtaining financing for <br />Page 10 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />