My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:57:43 AM
Creation date
1/3/2017 3:04:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
direetives to as <br />and <br />f YY Y« , pfepafe a <br />as reqi4ed' <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in respect <br />to Shop Drawings and Samples and other data which Contractor is required to submit, but <br />only for conformance with the information given in the Contract Documents and <br />compatibility with the design concept of the completed Project as a functioning whole as <br />indicated by the Contract Documents. Such reviews and approvals or other action will not <br />extend to means, methods, techniques, sequences, or procedures of construction or to safety <br />precautions and programs incident thereto. Engineer shall meet any Contractor's submittal <br />schedule that Engineer has accepted. <br />12. Substitutes and "or -equal": Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />,l d reastinably a fo *dreeeive and reviewfeview Aeel4ifieates f ifispeefietis, testa <br />-dieffte eeWhafiee . r................4.. h the Geiy&aet and will aiat etiftstitate fffl .l «apetid-eSt <br />he 4s p h Geii4raet Da, u ffie..ta Hagineer shall be efi fifle to rely Of the « ..14a <br />1 <br />tliremelof stteh tests. <br />14. Disagreements between Owner and Contractor: Render formal written decisions on all duly <br />submitted issues relating to the acceptability of Contractor's work or the interpretation of <br />the requirements of the Contract Documents pertaining to the execution, performance, or <br />progress of Contractor's Work; review each duly submitted Claim by Owner or Contractor, <br />and in writing either deny such Claim in whole or in part, approve such Claim, or decline to <br />resolve such Claim if Engineer in its discretion concludes that to do so would be <br />inappropriate. In rendering such decisions, Engineer shall be fair and not show partiality to <br />Owner or Contractor and shall not be liable in connection with any decision rendered in good <br />faith in such capacity. <br />13 4pplleatiens fief Payment,- Based on n gi. er's obsa«..ations as an experieneed„a <br />(Exhibit A— Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.