My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:57:43 AM
Creation date
1/3/2017 3:04:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
30. Substantial Completion — The time at which the Work (or a specified part thereof) has <br />progressed to the point where, in the opinion of Engineer, the Work (or a specified part <br />thereof) is sufficiently complete, in accordance with the Contract Documents, so that the <br />Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br />The terms "substantially complete" and "substantially completed" as applied to all or part <br />of the Work refer to Substantial Completion thereof. <br />31. Supplier — A manufacturer, fabricator, supplier, distributor, materialman, or vendor having <br />a direct contract with Contractor or with any Subcontractor to furnish materials or <br />equipment to be incorporated in the Work by Contractor or Subcontractor. <br />32. Total Project Costs — The sum of the Construction Cost, allowances for contingencies, and <br />the total costs of services of Engineer or other design professionals and consultants, <br />together with such other Project -related costs that Owner furnishes for inclusion, including <br />but not limited to cost of land, rights -of -way, compensation for damages to properties, <br />Owner's costs for legal, accounting, insurance counseling and auditing services, interest <br />and financing charges incurred in connection with the Project, and the cost of other services <br />to be provided by others to Owner pursuant to Exhibit B of this Agreement. <br />33. Work— The entire construction or the various separately identifiable parts thereof required <br />to be provided under the Contract Documents. Work includes and is the result of <br />performing or providing all labor, services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating all materials and equipment into <br />such construction, all as required by the Contract Documents. <br />ARTICLE 8 — EXHIBITS AND SPECIAL PROVISIONS <br />8.01 Exhibits Included: <br />A. Exhibit A, Engineer's Services. <br />B. Exhibit B, Owner's Responsibilities. <br />C. Exhibit Cl and C2, Payments to Engineer for Services and Reimbursable Expenses. <br />D. ExhibitD, Duties, Responsibilities and Limitations of Authority of Resident Project <br />Representative. NOT INCLUDED <br />E. Exhibit E, Notice of Acceptability of Work. NOT INCLUDED <br />F. Exhibit F, Construction Cost Limit. NOT INCLUDED <br />G. Exhibit G, Insurance. <br />H. Exhibit H, Dispute Resolution. <br />I. Exhibit I, Limitations of Liability. NOT INCLUDED <br />J. Exhibit J, Special Provisions. NOT INCLUDED <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.