Laserfiche WebLink
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Corby Boulevard Sidewalk <br />PROJECT NO. 116-087 — Division C — (CaN <br />QUOTES DUE December <br />2016 at 10:30 a. <br />nts <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />1,500.00 <br />$ 1,500.00 <br />2 <br />CPM SCHEDULE <br />1 <br />LS <br />250.00 <br />$ 250.00 <br />3 <br />CPM SCHEDULE, MONTHLY <br />UPDATE <br />2 <br />EACH <br />50.00 <br />$ 100.00 <br />4 <br />MOBILIZATION AND <br />DEMOBILIZATION <br />1 <br />LS <br />2,000,00 <br />$ 2,000.00 <br />5 <br />CLEARING AND GRUBBING <br />1 <br />LS <br />2,000.00 <br />$ 2,000.00 <br />6 <br />PAVEMENT, CONCRETE, REMOVE <br />10 <br />SYS <br />50.00 <br />$ 500.00 <br />7 <br />EXCAVATION, COMMON <br />27 <br />CYS <br />250.00 <br />$ 6,750.00 <br />8 <br />BORROW <br />18 <br />CYS <br />250.00 <br />$ 4,600.00 <br />9 <br />SIDEWALK, CONCRETE, 4 IN <br />325 <br />SYS <br />50.00 <br />$ 16,250.00 <br />10 <br />CURB RAMP, CONCRETE <br />12 <br />SYS <br />300.00 <br />$ 3,600.00 <br />11 <br />CASTING, ADJUST TO GRADE <br />1 <br />EACH <br />600.00 <br />$ 600.00 <br />12 <br />SODDING, NURSERY AND <br />TOPSOIL <br />230 <br />SYS <br />12.50 <br />$ 2,875.00 <br />13 <br />SPRINKLER REPAIR ALLOWANCE <br />1000 <br />DOL <br />$1.00 <br />$1,000,00 <br />14 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />1,000.00 <br />$1,000.00 <br />Total Amount of Quote <br />$ 42,925.00 <br />Firm: Rieth-Riley Construction Co. Inc. <br />Address: <br />25200 <br />State Road 23 <br />City/State/Zip: <br />South <br />Bend, In. 46614 <br />Telephone Number: ( 574 ) 288-8321 <br />Fax Number: ( 574�j) 233-3464 <br />By <br />(Signature) <br />Robert A. Nichols II, Engineer/Estimator <br />(Printed Name of Person Signing) <br />Version 10/18/2016 Page - 31 Public Works Quote <br />