My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:49:57 PM
Creation date
12/14/2016 3:15:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 38 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: <br />City of South Bend <br />ENGINEER: <br />Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: <br />Rieth-Riley Construction <br />PROJECT: <br />South Bend One -Way to Two -Way Conversion Division A <br />Project No. 116-001 <br />SUBJECT: <br />Pavement Message Marking Removal. <br />ISSUE DATE: <br />November 29, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />A pay item is being added to account for the work of removing the pavement <br />messages (arrows) and (only's) and stop bars. These messages where <br />unaccounted for on the side streets of Sample, Monroe, Western, Wayne, <br />Jefferson, Washington, Colfax, LaSalle and Madison. The messages had to be <br />changed due to the realignment of the side streets to allow new turn lanes <br />associated with the new traffic pattern on Main Street and Michigan. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1. Bid/Proposal Form: <br />Division B: <br />Add EWA Line Item No. 476: Pavement Message Marking, Remove, 98 ea @ <br />$82.50/ea for a total addition of $8,085.00 <br />Add EWA line Item No. 477: Transverse Marking Removal 24", 1130 Ift. @ $4.40/lft for <br />a total addition of $4,972.00 <br />SPECIFICATIONS: <br />None <br />DRAWINGS: <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.