Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-035(rev 1) Date: 8/9/16 <br />Submitted in Response to Proposal Request No.: <br />Contract Name and No.: _ - 114-053 South_Bend W WTP Secondary Treatinent Improvements <br />Contractor: Thieneman Construction, Inc. <br />Subject: Per the attached RFI #70, at Aeration Tank #1 Pass # 1's walls, an existing 1" conduit_ was found to be cast <br />into the existing wall. The conduit runs from an existing control box etween ass #1 & Pass #2 across the eeranon <br />tank influent channel onto the deck. The conduits route across the influent channel is below the existing concrete <br />walkway out to the aeration tanks. This walkway along with the Pass # I walls are to be removed per Drawing S-02 & <br />detail 1 on S-03. This conduit will affect the saw cutting demolition of the wall and the walkway if it is not relocated. <br />Additionally, if the conduit is left in place, it will be cast into the new wall and walk way deck that is shown on Detail 4 <br />on sheet S-07. Additional costs will be present if the conduit is re-routed or if additional labor is required to chip <br />around this conduit during the demolition process. The response stated "the existing V conduit in question feeds <br />power to gates on the East end of the Aeration Tanks. This feed is to be temporarily powered during construction so <br />that the conduit in concrete can ber removed and reconnected when the new concrete in installed. Use 1" flexible <br />sealtight conduit with enough slack to allow construction to occur. Remove the light pole that is embedded in the <br />concrete. Install temporary lighting on top of Gallery 1 to replace light from pole being removed from walkway. <br />Additional info for permanent installation will be forthcoming." The following costs are for the work we were directed <br />to perform in this RFI. <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (attach and list supporting information as required) <br />1. Item: Sweney: Remove Existing & Temp = $2,296 + Remove Temp & Pull New/Terininate = $1,154 <br />2. Item: TCI—PM lhrs @ $125/hr, PS 2 bra @I10/hr, PE Ihr @ $75/hr, PC Ihr @ $50/hr <br />JUSTIFICATION: <br />1. Item: Unforeseen Condition <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and <br />Subcontractors, Supplier quotations, and other information required. <br />For the Contract Times, state increase, decrease, or no change to Contract Times far Substantial Completion, <br />readiness for final payment, and Milestones, if any. If increase or decrease, state specific number of days for <br />changes to the Contract Times. <br />Deseti tion <br />Amount <br />Contract Times da s <br />Substantial <br />Final <br />1. Item —Swene + 5% Sub Markup$3 <br />623.00 <br />0 <br />0 <br />2. Item —TCI + 15% TCI Markup <br />$541.00 <br />0 <br />0 <br />Total This Change Order Proposal <br />$4,164.00 <br />0 <br />0 <br />Changes to Milestones, if any: <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the pmphsed cha gn. <br />Change Order Proposal By: Allen Gaarder <br />Signature of Proposer: <br />