My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:55:38 PM
Creation date
12/14/2016 3:10:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />REQUEST FOR INTERPRETATION <br />Contractor: Thieneman Construction, Inc. <br />Date <br />Transmmitted: <br />Date Response <br />Requested: <br />04/07/2016 <br />04/14/2016 <br />Subject: Aeration Tank #1 Pass #1- Conduit <br />Specification Section and <br />Paragraph: <br />Drawings: S-02, S-03, S-07 <br />INTERPRETATION REQUESTED: <br />RFI NO RFI-070 <br />Date 04/07/2016 <br />Received: <br />Date Response Transmitted: 05/10/2016 <br />During a site walkthrough for the structural demolition work for Aeration Tank #1 Pass #1's walls, an existing 1" conduit was found to <br />be cast into the existing wall. The conduit runs from an existing control box between Pass #1 & Pass #2 across the aeration tank <br />influent channel onto the deck. The conduits route across the influent channel is below the existing concrete walkway out to the <br />aeration tanks. This walkway along with the Pass #1 walls are to be removed per Drawing S-02 & detail 1 on S-03. This conduit will <br />affect the saw cutting demolition of the wall and the walkway if it is not relocated. Additionally, if the conduit is left in place, it will be <br />cast into the new wall and walk way deck that is shown on Detail 4 on sheet S-07. Accompanying pictures detail the location of this <br />conduit. It is not clear what all is powered from the wiring inside the conduit. Additional costs will be present if the conduit is re-routed <br />or if additional labor is required to chip around this conduit during the demolition process. <br />Please advise on how to proceed with this conduit. <br />Requested By: Allen Gaarder <br />ENGINEER'S RESPONSE: <br />Date: 04/07/2016 <br />The existing 1" conduit in question feeds power to gates on the East end of the Aeration Tanks. This feed is to be <br />temporarily powered during construction so that the conduit in concrete can be removed and reconnected when the new <br />concrete is installed. Use 1" flexible sealtight conduit with enough slack to allow construction work to occur. Remove the <br />light pole that is embedded in the concrete. Install temporary lighting on top of Gallery 1 to replace light from pole being <br />removed from walkway. Additional info for permanent installation will be forthcoming. <br />Signature(s): Omar Martin Date: 05/10/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.