My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - Olive St. and Sample St. Reconstruction - Lawson Fisher Assoc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - Olive St. and Sample St. Reconstruction - Lawson Fisher Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:52:51 PM
Creation date
12/14/2016 3:06:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -35727 <br />Change Order No:005 <br />Contract: <br />Project: <br />Change Order Nbr: <br />INDIANA <br />Department of Transportation <br />R -35727 <br />1298579 - Stste:129857900LC <br />005 <br />Change Order Description: Anchored Barrier Walt <br />Reason Code: CHANGED COND, Materials Related <br />CLN PCN PLN Item Code Unit Unit Price CO City 0253 1208679 0229 501.054of LFT 1 r Comment <br />Item Description: TEMPORARY TRAFFIC BARRIER TYPE 2 670 750,Og0 i <br />Supplemental Cosoriptlonl: Metal wall replacing concrete wall <br />Supplemental Descriplion2; using less anchors per lineal foot <br />Date: 11 /08/2016 <br />Page: 3 <br />Amount Change <br />Amounvs 11.752.50 <br />Total Value for Change Order 006 = $11,752.50 <br />Whomas, the Standard Specifications for this contract provides for such work to be performed, the following change Is recommended, <br />General or Standard Change Order Explanation <br />This is a metal barrier wall that uses only 4 anchors every 33 feet. This wall is replaces the concrete bather wall requiring 5 anchors eve <br />rael. This wall Is being placed an the north side of the Semple St Bridge Deck Into the newly poured Concrete binge deck. St Joseph County <br />requested the change using a will requiring less anchors per LFT to help extend the fife of the new bridge deck. N tart <br />Change Order Explanation for Speclflc Lino (torn <br />....,...,«.............. ...... ........................... ...... ..... ,............... «......... ,......... ,.......... <br />,.... <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />NOt18catlon and consent to this change order is hereby acknowledged. <br />contractor_"? u - n�lr _ <br />Signed <br />Date:_lI-iI —IIr, / <br />NOTE: Other required State and FHWA signatures will be obtained electronimily through the SlteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.