My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Herrman & Goetz, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Herrman & Goetz, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:48:27 PM
Creation date
11/23/2016 9:34:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Four Winds Stadium <br />Scope of work: continued <br />Condensing units <br />1. Check condenser coil for cleanliness. <br />2. Check refrigerant charge. <br />3. Perform refrigerant leak test. <br />4. Check crankcase heater. <br />5. Check compressor amp draw. <br />6. Check condenser motor amp draw and operation. <br />7. Check electrical connections. <br />8. Check condenser fan blades. <br />Air handlers <br />1. Provide and replace blower drive belt once per year. <br />2. Inspect bearings and lubricate same if applicable. <br />3. Clean condensate drain pan and trap. <br />4. Check and lubricate damper linkages. <br />5. Check coils for cleanliness. <br />• Make up air units <br />1. Clean burner. <br />2. Test burner combustion and provide a report. <br />3. Check operation of burner operating and safety controls. <br />4. Check gas pressure. <br />5. Replace blower drive belt once per year. <br />• Boiler <br />1. Clean burner. <br />2. Check burner combustion and provide a report. <br />3. Check operating and safety control operation. <br />4. Check operation of pressure temperature relief valve. <br />5. Check operation of the water pressure reducing valve. <br />6. Check and record boiler operating pressure. <br />7. Check gas pressure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.