My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Dynamic Mechanical Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Dynamic Mechanical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:47:21 PM
Creation date
11/23/2016 9:33:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
%:7ic <br />hanica/ <br />ervices <br />November 21, 2016 <br />South Bend Board of Public Works <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />Dear Nick: <br />Dynamic Mechanical Services, Inc <br />1606 Chestnut Street <br />Mishawaka, IN 46545 <br />Phone: 574-257-0123 <br />Fax: 574-257-0126 <br />Dynamic Mechanical Services, Inc. is pleased to provide the following proposal <br />for HVAC equipment located at the Four Winds Field 501 W. South St. location. <br />We plan to perform the following: <br />Spring Inspections: <br />1. Check of all compressor(s), refrigerant pressures and temperatures <br />2. Check oil levels and refrigerant charge <br />3. Visually check for leaks <br />4. Verify proper operation of equipment <br />5. Check control circuit and electrical circuit including voltages and amps <br />6. Check motors, belts, and bearings lubricate as required <br />7. Inspect coils and recommend cleaning as needed <br />8. Inspection of all operating controls and safety controls <br />9. Inspect and clean drain pan and drain lines as needed <br />Fall Inspections: <br />1. Check gas pilot(s), burner(s), pressures and operation <br />2. Verify proper operation <br />3. Check burner and heat exchanger <br />4. Check pilot and ignition electrical system <br />5. Test all safety and operating controls <br />6. Check motors, belts, and bearings lubricate as required <br />7. Check flue piping and flue fire box <br />8. Inspection of all operating controls and safety controls <br />List of equipment to be covered under this proposal. <br />Qtv <br />Manufacturer Location <br />Type <br />1 <br />Bryan <br />Basement Mech <br />Boiler CL-15OW-FDO <br />1 <br />Carrier <br />Ticket Office <br />AHU-1 40RR008530 <br />1 <br />Carrier <br />Operations <br />AHU-2 40CH048300 <br />1 <br />Carrier <br />Visitors Side <br />AHU-3 40RR208000 <br />Your Single Source Provider For ALL Of Your Mechanical Needs <br />
The URL can be used to link to this page
Your browser does not support the video tag.