My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Dynamic Mechanical Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Dynamic Mechanical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:47:21 PM
Creation date
11/23/2016 9:33:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSISTENCY <br />Nationwide, Trane technicians follow documented, formal processes that ensure uniform service delivery. As an OEM, Trane <br />has developed exclusive service procedures which provide the most reliable outcomes, and extended equipment longevity, <br />at the most cost-effective price. <br />• Exclusive service work Flow processes provide detailed steps and information encompassing parts, materials, tools <br />and sequence of execution <br />• Additional steps addressing safety, quality control, work validation and environmental compliance <br />• Technicians must consistently reference documented processes to ensure no critical steps are skipped or omitted <br />• Applicable service processes meet or exceed ASHRAE 180-2008 Standard Practice for Inspection and <br />Maintenance of Commercial Building HVAC Systems <br />CUSTOMER SERVICE FLOWS <br />The following Customer Service Flows provide additional service description detail for Covered Equipment. Note: There may <br />be differences per the agreement in the work being performed between sites and the equipment on those sites. This section <br />clarifies differences in the work being performed between sites and the equipment on those sites: <br />Service 1: Centrifugal Annual Inspection <br />Description <br />• Initial Site Inspection <br />• Review Diagnostics (Standard) <br />• Manual Chiller Log (Applied) <br />• Oil Level Check (Screw Machines) Per Circuit <br />• Compressor And Oil Separator Heater Check <br />• Oil Analysis Per Circuit <br />• Flow/Differential Mechanical Switch Check <br />• Customer Notification Of Chiller Shut Down Including Lock Out <br />• Leak Test Inspection (Positive Pressure) <br />• Control Panel Calibration Check <br />• Low Temperature Sensor Calibration <br />• Control Panel Electrical Inspection - Centrifugal <br />• Compressor Starter Inspection (Wye -Delta Closed Transition) Series R Air Cooled <br />• Meg Compressor Motor <br />• Pre -Start Chiller Check (Standard) <br />• Start Chiller <br />• Compressor Check (HeliRotor Compressors) <br />• High Side Leak Check Inspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.