My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Dynamic Mechanical Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Dynamic Mechanical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:47:21 PM
Creation date
11/23/2016 9:33:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ynamic <br />echanical <br />ervices <br />November 21, 2016 <br />South Bend Board of Public Works <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />Dear Nick: <br />Dynamic Mechanical Services, Inc <br />1606 Chestnut Street <br />Mishawaka, IN 46545 <br />Phone: 574-257-0123 <br />Fax: 574-257-0126 <br />Dynamic Mechanical Services, Inc. is pleased to provide the following proposal <br />for HVAC equipment located at the Century Center 120 S. St. Joseph St. <br />We plan to perform the following: <br />Spring Inspections: <br />Centrifugal Annual Inspection <br />Description <br />• Initial Site Inspection <br />• Review Diagnostics (Standard) <br />• Manual Chiller Log (Applied) <br />• Oil Level Check (Screw Machines) Per Circuit <br />• Compressor And Oil Separator Heater Check <br />• Oil Analysis Per Circuit <br />• Flow/Differential Mechanical Switch Check <br />• Customer Notification Of Chiller Shut Down Including Lock Out <br />• Leak Test Inspection (Positive Pressure) <br />• Control Panel Calibration Check <br />• Low Temperature Sensor Calibration <br />• Control Panel Electrical Inspection - Centrifugal <br />• Compressor Starter Inspection (Wye -Delta Closed Transition) Series R Air <br />Cooled <br />• Meg Compressor Motor <br />• Pre -Start Chiller Check (Standard) <br />• Start Chiller <br />• Compressor Check (HeliRotor Compressors) <br />• High Side Leak Check Inspection <br />Spring and Fall Inspections: <br />Lochinvar Boilers <br />• Check gas pilot(s), burner(s), pressures and operation <br />• Verify proper operation Check burner and heat exchanger <br />Your Single Source Provider For ALL Of Your Mechanical Needs <br />
The URL can be used to link to this page
Your browser does not support the video tag.