My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Christopher Burke Engineering - South Bend Dam Capital Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Christopher Burke Engineering - South Bend Dam Capital Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:11:10 PM
Creation date
11/9/2016 1:53:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDC <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />This is Appendix <br />Standard Hourly <br />1, Engineer's <br />Rates, referred to in <br />and part of the Short Form of Agreement <br />between Owner and Engineer for <br />Professional Services dated November 8, <br />2016 . <br />Engineer's Standard Hourly Rates <br />A. Standard Hourly Rates: <br />1. Standard Hourly Rates are set forth in this Appendix 1 and include salaries <br />and wages paid to personnel in each billing class plus the cost of customary <br />and statutory benefits, general and administrative overhead, non -project <br />operating costs, and operating margin or profit. <br />2. The Standard Hourly Rates apply only as specified in Paragraphs 7.01 and <br />7.02, and are subject to annual review and adjustment. <br />B. Schedule of Hourly Rates: <br />Hourly rates for services performed on or after the Effective Date are: <br />Personnel <br />($/Hr� <br />EngineerVI........................................................................................................................................................... <br />216 <br />EngineerV............................................................................................................................................................. <br />190 <br />EngineerIV........................................................................................................................................................... <br />168 <br />EngineerIII........................................................................................................................................................... <br />139 <br />EngineerI/II........................................................................................................................................................ <br />111 <br />ResourcePlanner V............................................................................................................................................. <br />151 <br />ResourcePlanner IV........................................................................................................................................... <br />139 <br />ResourcePlanner III.......................................................................................................................................... <br />125 <br />ResourcePlanner I/II......................................................................................................................................... <br />105 <br />EngineeringTechnician IV................................................................................................................................ <br />145 <br />EngineeringTechnician III................................................................................................................................ <br />130 <br />EngineeringTechnician I/II.............................................................................................................................. <br />105 <br />CADII................................................................................................................................................................... <br />121 <br />CADI..................................................................................................................................................................... <br />107 <br />GISSpecialist III.................................................................................................................................................. <br />130 <br />GISSpecialist I/II..................................................................................................................................................95 <br />Environmental Resource Specialist V.............................................................................................................. <br />151 <br />Appendix 1, Standard Hourly Rates Schedule <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.