My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2016 Parking Garage Improvements - Grand River Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - 2016 Parking Garage Improvements - Grand River Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:26:51 PM
Creation date
11/9/2016 10:30:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18 <br />Electrical <br />1 <br />LS <br />1/ <br />19 <br />General Trades <br />1 <br />LS <br />20 <br />General Conditions <br />1 <br />LS <br />Z �/ <br />BASE BID TOTAL Z� <br />ALTERNATE #1: DIVISION B ADDITIONAL <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Remove & replace roof of Leighton <br />21 <br />Plaza Stair Tower 1 as necessary to <br />1 <br />LS <br />C� 50 <br />replace elevator machine. <br />/ <br />F <br />ALTERNATE #1 TOTAL '5 <br />ALTERNATE #2: DIVISION D ADDITIONAL <br />Item <br />No, <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Remove & replace roof of Leighton <br />22 <br />Plaza Stair Tower 2 as necessary to <br />1 <br />LS <br />CS <br />replace elevator machine. <br />ALTERNATE #2 TOTAL S , 5 dl- le5 <br />ALTERNATE #3: DIVISION A DEDUCT <br />Item <br />No. <br />Descri tion <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />23 <br />NEMA 1 elevator and electrical fixtures <br />in Wayne Street <br />1 <br />LS <br />CS Z, <br />' <br />�'-Z <br />Northwest Tower <br />ALTERNATE #3 TOTAL <br />ALTERNATE #4: DIVISION B DEDUCT <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />24 <br />NEMA 1 elevator and electrical fixtures <br />1 <br />LS <br />S�/�25� <br />j ly-3 Z <br />in Leighton Plaza Stair Tower 1 <br />ALTERNATE #4 TOTAL <br />ALTERNATE #5: DIVISION C DEDUCT <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />25 <br />NEMA 1 elevator and electrical fixtures <br />in <br />1 <br />LS <br />Z <br />Wa ne Street Southeast Tower <br />J 67 <br />J <br />ALTERNATE #5 TOTAL ��� 7Z <br />ALTERNATE #6: DIVISION D DEDUCT <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />26 <br />NEMA 1 elevator and electrical fixtures <br />in <br />1 <br />LS <br />Leighton Plaza Stair Tower 2 <br />ALTERNATE #6 TOTAL <br />Version 7/31/2015 Contractor's Bid for Public Works - 8 <br />Grand River Construction, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.