My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Ziolkowski Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Ziolkowski Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:24:19 PM
Creation date
11/9/2016 10:27:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Division G — Wilber from Sibley to Fassnacht <br />Item <br />No. <br />Descri tion <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />150 <br />SY <br />68 <br />10 200 <br />2 <br />PAIRED PERPENDICULAR CURB RAMP <br />9 <br />SY <br />108 <br />972 <br />3 <br />CONCRETE APPROACH, 6-INCH <br />14 <br />SY <br />126 <br />1,764 <br />4 <br />B BORROW <br />15 <br />CY <br />35 <br />525 <br />6 <br />GRADING, TOPSOIL, AND SODDING <br />45 <br />SY <br />25 <br />1,125 <br />Division G Base Bid Total 14,586 <br />Division H — Wilber from Fassnacht to Longley <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />I CONCRETE SIDEWALK, 4-INCH <br />143 <br />SY <br />68 <br />9,724 <br />2 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />108 <br />756 <br />3 <br />DEPRESSED CORNER CURB RAMP <br />115 <br />1 150 <br />4 <br />CONCRETE APPROACH, 6-INCH <br />17SY <br />126 <br />1 764 <br />5 <br />BBORROW <br />35 <br />490 <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />25 1 <br />1 075 <br />Division H Base Bid Total 14,959 <br />Division I —Woodward Ave. <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />142 <br />SY <br />68 <br />9,656 <br />2 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />9SY <br />108 <br />972 <br />4 <br />CONCRETE APPROACH, 6-INCH <br />27gLF <br />126 <br />3 402 <br />5 <br />CONCRETE CURB, MODIFIED <br />;365q <br />26 <br />490 <br />6 <br />B BORROW <br />20 <br />35 <br />700 <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />13 <br />25 <br />3,350 <br />Division I Base Bid Total 27. <br />Alternate #1 — Division I <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />100 <br />SY <br />68 <br />- <br />6,800 <br />6 <br />B BORROW <br />14 <br />CY <br />35 <br />490 <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />100 <br />SY <br />25 <br />2,500 <br />Division I Alternate #1 Total 9,790 <br />Division I Base Bid + Alternate #1 Total 37,360.00 <br />Version 7/28/2016 Contractors Bid for Public Works - 8 Bidder's Name: ZiOlkOwski <br />
The URL can be used to link to this page
Your browser does not support the video tag.