My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Selge Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Selge Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:22:20 PM
Creation date
11/9/2016 10:25:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND �4sovTny, <br />MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY <br />DEVELOPMENT PROGRAM <br />•s z <br />FORM MWBE-2.0 " <br />EVIDENCE OF GOOD FAITH EFFORTS <br />i nos compiecec Tom snouid be included as part of the Bids documents related to City of South Bend Public <br />Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole <br />responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority <br />or Women's owned business as defined by the Indiana Department of Administration (` IDOA"). <br />Project Number: 116-029A <br />Project Name: 2016 Curb and Sidewalk Construction Phase If <br />Bidder: Selge Construction Co., Inc. <br />Date: 11 /8/16 <br />Contact Person: James BOVles, Vice President Telephone: <br />Address: <br />City: <br />Email: <br />269-684-0842 <br />Zip: 49120 <br />jboyles@selgeconstruction.com <br />To determine whether bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set <br />forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or <br />commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': <br />Niles <br />State: MI <br />f <br />E OF GOOD FAITH EFFORTS <br />LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business <br />Diversity Development Program, which uses the IDOA approved list of Minority and Women <br />siness as found on their website (http://www.in.gov/idoa). <br />ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South <br />Bend requires that all perspective bidders complete no less than 2 of the following: <br />1. Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and <br />subcontracting opportunities. <br />n ( 2�.1 Advertise in general circulation and/ortrade association publications concerning subcontracting <br />opportunities, and allow MBE/WBEs reasonable time to respond. <br />Perform any and all necessary steps to provide written notice in a manner reasonably calculated <br />to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to <br />participate effectively. <br />Utilize pre-existing services of available community organizations, small and/or disadvantaged <br />�J business assistance offices and other organizations that provided assistance in the recruitment <br />and placement of MBEAVBE firms. <br />'Bidder must circle or otherwise notate which of the two (2) required actions were performed. <br />GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBENVBEs, <br />including providing such MBENVBE's with adequate information about the plans, specifications and other <br />requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business <br />reasons based on a thorough investigation of their capabilities. <br />SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by <br />MBENVBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down <br />contracts into smaller units to facilitate MBENUBE participation) <br />CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has <br />bid on the subcontracting opportunity: <br />1. Name, address, and telephone number; <br />2. A description of information provided by the bidder or subcontractor; and <br />3. A statement of whether an agreement was reached, and if not, why not, including any reasons for <br />concluding that the MBE/WBE was unqualified to perform the job. <br />rGpa V1 ouuu raver Error[ requires your initials next to all of the above boxes. Any <br />omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of <br />South Bend reserves the right to request additional information. <br />Version 7/28/2016 <br />Contractors Bid for Public Works - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.