My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Premium Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Premium Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:20:55 PM
Creation date
11/9/2016 10:23:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PREMIUM <br />CONCRETE <br />SERVICES, INC. <br />SECTION II PLAN AND EQUIPMENT QUESTIONAIRE <br />1) After given the notice to proceed Premium Concrete Services, Inc. will contact Indiana 811 to <br />locate all utility lines within construction limits. Traffic maintenance will begin, including use of <br />barrels and signage supplied by State Barricading and/or Premium Concrete Services, INC. Layout <br />and staking of site will be next. Then the excavation and grading will begin, including tree <br />removal, clearing of right away, common excavation, borrow placement and compaction, with a <br />crew consisting of 3-5 workers. After excavation and grading phases are complete, concrete work <br />will commence. Crews of 4-6 workers will install curb, sidewalk and approaches. Black dirt and <br />sod will be placed as soon as concrete in that section has been poured. Project with be completed <br />by July 7, 2017. <br />2) a) State Barricading — 24963 US 20 West South Bend, IN 46628 —Traffic Maintenance and Signs. <br />b) Acorn Landscaping —3680 W Sample St South Bend, IN 46619 — Sodding, seeding, and general <br />landscaping. <br />c) Kachur Tree Service, LLC- 316 Fulkerson Rd Niles, MI 49210-Tree Removal <br />d) Weaver Consultants Group —7121 Grape Road Granger, IN 46530 — Materials testing. <br />e) Walsh & Kelly —24358 IN-23 South Bend, IN 46614 — Asphalt <br />f) Niblock Excavating —906 Maple St Bristol, IN 46507 — Asphalt and Excavation <br />3) Premium Concrete Services, Inc. Does not require bonding for its subcontractors <br />a) State Barricading — 24963 US 20 West South Bend, IN 46628 <br />b) Weaver Consultants Group — 7121 Grape Road Granger, IN 46530 <br />c) Bertsch -Frank & Associates LLC-811 Lawrence Drive Fort Wayne, IN 46804 <br />4) Equipment use for project: Bobcat, Mini Excavator, Excavator, Curb Machine, Compactor, Roller, <br />Walk -behind Saw, Cut-off Saw, Vibra Strike, Stump Grinder, Hi -Ranger, Dump Truck <br />5) Yes, Premium Concrete Services, Inc. has quotes for all materials in proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.