Laserfiche WebLink
PROPOSAL <br />PREMIUM CONCRETE SERVICES, INC. <br />PRElY IU*iV�.1+ 712 Richmond Street <br />CONCRE E Elkhart, IN 46516 <br />SERVICES, INC. <br />Contact: Jeremy.lankoviak <br />Phone: 574-264-0196 <br />Cell: 574-612-6405 <br />uote'rw <br />.lob Name: 116-083D Randolph St. <br />Date of Plans, <br />HCSS #: 4512 <br />Phone: <br />Revision Date: <br />Email: <br />Fax: <br />Date: <br />PREMIUM CONCRETE IS DBE / WBE CERTIFIED <br />ITEM <br />I DESCRIPTION <br />QUANTFFY <br />UNIT <br />UNIT PRICE <br />AMOUNT <br />I <br />Mobilization and Demobilization <br />1.00 <br />US <br />1,500.00 <br />1,500.00 <br />17 <br />Combination Curb & Gutter Type B <br />80.00 <br />LFT <br />65.00 <br />5,200.00 <br />IR <br />Header Curb, Special <br />52.00 <br />110.00 <br />5,720.00 <br />20 <br />HMA for Patching, Type A <br />25.00175.00 <br />#LFT <br />4.375.00 <br />500 <br />Saw Cutting <br />85.00 <br />9.50 <br />807.50 <br />NOTES: <br />1) Permits, bond, fees, inspection, testing, layout, licenses and engineering by others <br />2) All grade to be +/- 0. 10'compacted to specifications by others <br />3) Barricades and flag Control by others <br />4) Concrete wash out area to be provided by others <br />5) All hubs for curb work must be spaced no more than every 25 If <br />6) Bid price firm for a period of 15 calendar days <br />7) Stringline, used by others will be set up once. Additional cost involved in resetting, adjusting, mobilization, etc. will be <br />passed on to the prime contractor. <br />Page 1 of 1 <br />