My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Ireland Road Storm Repairs Proj No. 116-083G - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Quote Opening - Ireland Road Storm Repairs Proj No. 116-083G - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:42:26 PM
Creation date
10/26/2016 4:07:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL <br />I� �CsIA-�t��II PREMIUM CONCRETE SERVICES, INC. <br />/r� �Re��a*r.��p)TmC 712 Richmond Street. <br />M\/a RETE Elkhart, IN 46516 <br />SEBV{CES, INC. <br />Contact: Jeremy Jankoviak <br />Phone: 574-264-0196 <br />Cell: 574-612-6405 <br />Quote To: <br />Job Name: 116-083G Ireland Rd. <br />Date of Plans: <br />HCSS #: 4517 <br />Phone: <br />Revision Date: <br />Email: <br />Fax: <br />Date: <br />PREMIUM CONCRETE IS DBE / WBE CERTIFIED <br />ITEM <br />I DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />AMOUNT <br />4 <br />Mobilization and Demobilization <br />1.00 <br />LS <br />5,000.00 <br />5,000.00 <br />12 <br />HMA Patching Type C <br />22.00 <br />TON <br />358.00 <br />7,876.00 <br />13 <br />HMA Surface Type C <br />5.00 <br />TON <br />534.00 <br />2,670.00 <br />18 <br />Combination Curb & Gutter "Type B <br />30.00 <br />LET <br />65.00 <br />1.950.00 <br />22 <br />PCCP for Approaches <br />70.00 <br />SYD <br />85.00 <br />5,950.00 <br />26 <br />PCCP.9IN. <br />40.00 <br />SYD <br />100.00 <br />4,000.00 <br />NOTES: <br />1) Permits, bond, fees, inspection, testing, layout, licenses and engineering by others <br />2) All grade to be +/- 0.10'compaeted to specifications by others <br />3) Barricades and flag Control by others <br />4) Concrete wash out area to be provided by others <br />5) All (tubs for curb work must be spaced no more than every 25 If <br />6) Bid price firm for a period of 15 calendar days <br />7) Stringline, used by others will be set up once. Additional cost involved in resetting, adjusting, mobilization, etc. will be <br />passed on to the prime contractor. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.