Laserfiche WebLink
City of South Bend Project No. 114-062B <br />Change Order No. 4 - 09/30/16 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Patrick C. Kerr, PhD., P.E. <br />Professional Engineer No. 10707546 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />PROJECT: East Bank Sewer Separation - Phase 5 (Division B) <br />Project No. 114-062B <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: September 30, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item QtY Unit Price Days Total <br />1. Tree Removal 1 LS $25,900 0 $25,900 <br />2. Soil Delay 0 N/A $0.00 93 $0 <br />1) Trees and shrubs must be removed from beyond the right-of-way to allow for the contractor <br />to shape the slope on Northside Blvd. The shaping of the slope is necessary for bank <br />stabilization. <br />2) Please see attached memorandum for a breakdown of the delay dates. <br />