My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 4 2016 Curb and Sidewalk Construction Project No. 116-029 Premium Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 4 2016 Curb and Sidewalk Construction Project No. 116-029 Premium Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:52:21 PM
Creation date
10/25/2016 3:29:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It, <br />PREMIUM <br />CONCRETE <br />SERVICES. INC. <br />Premium Concrete Services, INC. <br />712 Richmond St <br />Elkhart, IN 46516 <br />Phone:(574)264-0196 <br />Fax:(574)266-5392 <br />October 17, 2016 <br />City of South Bend <br />731 S. Lafayette Blvd. <br />South Bend, IN 46601 <br />Ref: 2016 Curb and Sidewalk Construction <br />Project No. 116-029 <br />Premium Concrete Services, Inc. respectfully requests a time extension on the above referenced contract from 10/20/16 <br />to 10/28/16. This request is due to the delay of time caused by the notice to proceed on the project extension of <br />Woodward Street in Division D. <br />If Premium Concrete Services, INC. is awarded Woodward Street we respectfully request an additional 7 days. From <br />10/28/16to 11/11/16. <br />• On 9/16/2016 we received a notice to stop work on Division D Woodward St. We were done <br />with removals on other streets and moved removal operations to other projects. We were <br />scheduled to be done with the project on 10/13/2016. <br />• On 10/6/2016 we were informed to proceed with work on Woodward Street. At that time we <br />had mobilized all equipment and materials out. Also, informed our subcontractors to halt work, <br />because more quantities are being added. <br />• On 10/14/2016 we were asked to wait on proceeding on Woodward Street. That is a total of 8 <br />days. We are respectfully asking for those days. <br />• If we are awarded, which we hope we are, we respectfully request 14 more days to complete <br />Woodward Street. <br />• We are also worried about winter charges (starting Nov.1) that will be incurred if we are delayed <br />to long, and the losses incurred because of extra mobilizations. <br />A total of 8 days have been demonstrated. Therefore, we request 8 days as a time extension, which would extend the <br />completion date from 10/20/2016 to 10/28/2016. If awarded Woodward Street, we request an additional 14 days <br />moving the completion date to 11/11/2016. If you have any questions, comments, or require additional information <br />please contact me. <br />Sincerely, <br />Jeremy Jankoviak <br />Estimator/Project Manager <br />Jeremy@premiumconcreteonIine.com <br />Office: (574)264-0196Cell: (574)612-6405 <br />
The URL can be used to link to this page
Your browser does not support the video tag.