My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - Rieth Riley - SB One Way to Two Way Conversion
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - Rieth Riley - SB One Way to Two Way Conversion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:54:10 PM
Creation date
9/29/2016 9:42:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Myron Cohagan <br />Lochmueller Group <br />130 South Main St. Suite 300 <br />South Bend, IN 46601 <br />RE: Division B, EWA 025: New Signal Cabinets <br />Dear Mr. Cohagan, <br />September 9, 2016 <br />Per your request, the following is Rieth-Riley's pricing for the additional pay items required in Change <br />Order 421 of Division B. Please understand that the current lead time for these cabinets is eight to ten <br />weeks after approval of this pricing. As a result, additional contract time may be required to perform this <br />work. Upon approval of this change order we will release these materials for manufacturing at which <br />time we can discuss the timeline for this additional work. <br />Item # <br />Q <br />Unit <br />Description <br />Unit Price <br />Total <br />21 <br />9 <br />EA <br />Traffic Signal Equipment, Remove <br />$120.00 <br />$1,080.00 <br />239 <br />1 <br />EA <br />Tesco Cabinet, w/Single Service, <br />Foundation <br />$6,250.00 <br />$6,250.00 <br />276 <br />10 <br />EA <br />Thermal Detection Camera <br />$4,680.00 <br />$46,800.00 <br />277 <br />3 <br />EA <br />Thermal Detection System <br />$11,800.00 <br />$35,400.00 <br />EWA <br />10 <br />EA <br />Controller Rewire <br />$2,231.77 <br />$22,317.70 <br />EWA <br />9 <br />EA <br />Controller and Cabinet, P1 <br />$23,899.97 <br />$215,099.73 <br />EWA <br />40 <br />EA <br />Ped Isolation Cards <br />$561.71 <br />$22,468.40 <br />TOTAL <br />$349,415.83 <br />I have attached all the documentation which supports this pricing. Please let me know if you have any <br />questions or require any additional information. <br />Respectfully, <br />se *- Kirk 'at ck. <br />Scott Kirkpatrick <br />Estimator/Project Manager <br />Rieth-Riley Construction <br />25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 <br />
The URL can be used to link to this page
Your browser does not support the video tag.