Laserfiche WebLink
Change Order No. 23 <br />South Bend One -Way to Two -Way Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion, Division B <br />Project No. 116-001 (114-035) <br />SUBJECT: Concrete Header <br />ISSUE DATE: August 29, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. A pay item is being added to better reflect the concrete header shown on detail A2 <br />of the plans. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Add Line Item No. 466: Concrete Header (Per Detail A2), 1,000 LFT @ $13.75/LFT for <br />a total addition of $13,750.00 <br />SPECIFICATIONS: <br />None <br />DRAWINGS: <br />None <br />END OF CHANGE ORDER NO. 23 <br />Sheet 1 of 2 <br />