Laserfiche WebLink
SUBCONTRACTORS 109.04 (f) <br />WEEK ENDING: September 6 2016 <br />DESCRIPTION AMOUNT <br />Pemberton Davis Electric ($20,.00/EACH) $20,621.13 <br />TOTAL SUBCONTRACT WEEK ENDING $20,621.13 (29) <br />10 % x LINE (30) $3,000.00 OR LESS $300.00 (31) <br />7 % x LINE (30) OVER $3,000.00 $1,233.48 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $22,154.61 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17), (22), (28) & (33) <br />1.1 % OF BOND RATE BASED UPON LINE (34) <br />10 % x LINE (35) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) <br />Page 3 of 3 <br />$23,614.23 (34) <br />$259.76 (35) <br />$25.98 (36) <br />$23,899.97 (37) <br />