Laserfiche WebLink
LAWSON-FISHER ASSOCIATES P.C. Job # : Sheet: <br />525 WEST WASHINGTON AVENUE Designed by: BPH Date: 68/23/16 <br />SOUTH BEND, INDIANA 46601 Checked by: Date: <br />Project: South Bend -Emergency Repair of Chippewa Ave. Subject: Conceptual Cost Estimate <br />Project Description: Emergency Repair of Chippewa Avenue Pavement Undermining <br />No. <br />Item <br />Quantity <br />Unit <br />Unit <br />Cost <br />Total Cost <br />1 <br />Mobilization - Demobilization <br />1 <br />LSUM <br />5,000.00 <br />$ 5,000.00 <br />2 <br />Construction Engineering <br />I <br />LSUM <br />3,500.00 <br />3,500.00 <br />3 <br />Maintenance of Traffic <br />I <br />LSUM <br />3,500.00 <br />3,500.00 <br />4 <br />Clearing Right -of -Way <br />I <br />LSUM <br />3,500.00 <br />3,500.00 <br />5 <br />Excavation, Common <br />83 <br />CYS <br />15.00 <br />1,245.00 <br />6 <br />Borrow <br />120 <br />CYS <br />25.00 <br />3,000.00 <br />7 <br />Riprap, Revetment <br />35 <br />CYS <br />35.00 <br />1,225.00 <br />8 <br />Geotextile <br />70 <br />SYS <br />10.00 <br />700.00 <br />9 <br />Subgrade Treatment Type IA <br />165 <br />SYS <br />20.00 <br />3,300.00 <br />10 <br />HMA Surface <br />13 <br />Ton <br />100.00 <br />1,300.00 <br />11 <br />HMA Intermediate <br />21 <br />Ton <br />90.00 <br />1,890.00 <br />12 <br />HMA Base <br />66 <br />Ton <br />85.00 <br />5,610.00 <br />13 <br />Compacted Aggregate, No. 53, Base <br />50 <br />Ton <br />35.00 <br />1,750.00 <br />14 <br />Structure Cleaning <br />2 <br />EACH <br />5,000.00 <br />10,000.00 <br />15 <br />Miscellaneous items (10%) <br />1 <br />LSUM <br />3,500.00 <br />3,500.00 <br />Subtotal <br />$ 49,020.00 <br />+ 1596 Contingency <br />7,353.00 <br />11 Total (Rounded to nearest$1,000) <br />$ 57,000.00 <br />❑iPr .M28.61-SOUTH BEND- EMERGENCY REPAIR OF CHIPPEWA AVENUE'ENU,[Chlppew Repairs Cmstr Estimate, 8-22-16.x1s]Sheet1 <br />