Laserfiche WebLink
2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than "or -equal" items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3. Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />PART 3— PROJECT SCHEDULE <br />A3.01 Project Schedule -Design <br />A. Upon receiving the notice to proceed, the design completion will take approximately 4 weeks. It is <br />anticpacted that permitting through IDEM and the City of South Bend will take approximately 6 <br />weeks. Bidding will take approximately 3 weeks and can be started concurrently with the <br />permitting time frame. <br />Page 6 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />