My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revised CITY DOCUMENTS PROCEDURES AND PROGRAMS - Downspout Disconnection Program
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Revised CITY DOCUMENTS PROCEDURES AND PROGRAMS - Downspout Disconnection Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:54:33 AM
Creation date
8/30/2016 2:26:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(t1VO <br />U <br />Document DD3V1 <br />Commercial <br />The Code of Ordinance for disconnecting downspouts applies to commercial buildings too, with <br />these specific requirements. <br />• Owners must disconnect before November 23, 2020. <br />• Special exemptions must be applied for by November 23, 2018. <br />• To apply for an exemption you must undertake: <br />o A feasibility study, and; <br />o A cost/benefit analysis to confirm that compliance may be cost prohibitive due to <br />how your building was constructed, for example, having an internal drainage <br />system, or a lack of pervious surfaces on your property. <br />The building owner must apply using the official application form available here. Submit your <br />completed application to: Downspout Disconnection Program, City of South Bend 227 West <br />Jefferson Boulevard, Suite 1300 N, South Bend, Indiana 46601. <br />Upon receipt of your application, the DPW will review it. It will then meet with a representative of <br />the commercial property or development to discuss possible solutions and alternatives to <br />disconnection. These will include, but will not be limited to, the utilization of green stormwater <br />infrastructure (for example a green roof, or a rain garden) on or off the property, at the owner's <br />expense. The application will be presented to the Board of Public Works at a public meeting and <br />a decision will be made by the Board as to whether or not to grant an exemption. Applicants will <br />be notified in writing of the decision to grant or deny an exemption for each downspout. <br />DPW reserves the right to revoke an exemption previously issued where any information provided <br />is misleading or inaccurate, or when property and/or building conditions change. For example, <br />the property's landscaping is significantly modified or the roof is re -built. <br />Submit your completed application to: Downspout Disconnection Program, City of South Bend <br />227 West Jefferson Boulevard, Suite 1300 N, South Bend, Indiana 46601. <br />Remember, if your downspouts are still connected after the November 23 2020, and you have <br />not been granted an exemption you are in breach of the ordinance and will face enforcement <br />action including possible fines. <br />end <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.