My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 4 - SB One-Way to Two-Way Conversion Div A Proj No. 116-001 Rieth-Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 4 - SB One-Way to Two-Way Conversion Div A Proj No. 116-001 Rieth-Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:52:07 PM
Creation date
8/11/2016 1:46:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. 116-001 Change Order No.18 - <br />07/19/16 <br />Change Order No. 18 <br />One- Way to Two -Way Street Conversion Division A <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lawson -Fisher Associates P.C. <br />Ben Holden P.E. <br />Professional Engineer No. 10001145 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: One -Way to Two -Way Street Conversion <br />Project No. 116-001 <br />SUBJECT: Add pay items for curb removal and integral curb <br />ISSUE DATE: July 19, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be <br />incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Pay items "CONCRETE, CURB, INTEGRAL, TYPE B" and "INTEGRAL CONCRETE CURB" added to <br />correspond to Call Out #14 and Call Out #16, respectively, of the Division A, Part 1 of 2 drawing <br />2. Revise the Division A quantities for Line Item #12 "CURB, CONCRETE, REMOVE" and Line Item #11 <br />"PAVEMENT REMOVAL" to account for the fact that curb was removed separately and not in <br />conjunction with pavement removal. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />-i 191911\ L\ 1 &K603\.k Ii.1. N *Rlllli_ll <br />1. Bid/Proposal Form: <br />Division A: <br />Add 352 LFT to Line Item EWA: CONCRETE, CURB, INTEGRAL, TYPE B, 352 LFT @ $27.00/LFT <br />for a total addition of $9,504.00 <br />Add 1852 LFT to Line Item EWA: INTEGRAL CONCRETE CURB, 1852 LFT @ $26.00/LFT for a <br />total addition of $48,152.00 <br />Add 2,252 LFT to Line Item 12: CURB, CONCRETE, REMOVE, 2,252 LFT @ $7.00/LFT for a total <br />addition of $15,764.00 <br />Subtract 250 SYS from Line Item 11: PAVEMENT REMOVAL, 250 SYS @ $10.00/SYS for a total <br />deduction of $2,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.