My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - Olive Street and Sample Street Reconstruction Proj No 113-002 - INDOT
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 2 - Olive Street and Sample Street Reconstruction Proj No 113-002 - INDOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:50:54 PM
Creation date
8/11/2016 1:41:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract NOR -35727 INDIANA <br />Change Order No:002 Department of Transportation <br />Contract: R -35727 <br />Project: 1401192 - State:129557900LC <br />Change Order Nbr. 002 <br />Change Order Description: Existing Concrete Beam Repair <br />Reason Code: SCOPE CHANGES, Added puantiitleslitems <br />CLN PCN PLN Item Code unit Unit Price Co tatty comment <br />0248 1401192 0048 711-01996 LS 231'1501000 1.000 C <br />Item Description: REPAIR EXISTING STRUCTURE <br />Supplemental Oesadptianl: Repair Edsdng Beams on Sample St Bridge <br />Supplemental Descrlption2: <br />Date:07/20/2016 <br />Page: 3 <br />Amount Change <br />Amoum:0 23,15o.o <br />Total Value for Change Order 002 = $ 23,150.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />This Change Order (CO2) is to repair the deteriorated areas of beams 5 and 6 on the Sample St bridge. Areas were rotted with spelling concrete <br />end rusty reinforcing bars. Areas were <br />Change Order Explanation for Specific Line Rom <br />wun..o....u...,...w«...u......n..a....n....uwwu..........u.w,n.................m.»............... ..a.,.. <br />It is the Intent of the parties that this change order Is full and complete compeneaaon for the work describe above. <br />Notification and consent to He change order Is hereby aeknowlsdged. J <br />Contractor: r. � a t - 7 6% Signed <br />Date:_„ <br />NOTE; Other required State and FHWA signatures wig be obtained electronically through the SheManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.