My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Art Work Commission Agreement - Harold Langland
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Art Work Commission Agreement - Harold Langland
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 11:59:42 AM
Creation date
8/11/2016 1:34:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.2 Upon delivery of the Work to the City in accordance with Section 1.3, the City shall <br />assume all risks of loss, damage, or injury to the Work, including liability arising from the City's <br />installation and keeping of the Work on the Installation Site. Notwithstanding the foregoing <br />sentence, the Artist will indemnify the City for any liability arising out of any breach of the <br />Artist's warranty of materials and workmanship under Section 4.3 during .the term of said <br />warranty. <br />3.3 Notwithstanding Sections 3.1 and 3.2, in the event the Artist re -takes possession of the <br />Work at any time after delivery, then the Artist will again bear all risks of loss, damage, or injury <br />to the Work while it remains in the Artist's possession. <br />ARTICLE 4 — WARRANTIES <br />4.1 The Artist warrants that the full-size sculpture shall be a unique and only casting of the <br />Work, unless further casts are agreed upon in writing by both the City and the Artist (or the <br />Artist's Representative) in accordance with Section 5.1. <br />4.2 The Artist warrants that the Work will be his own artistic product. <br />4.3 The Artist warrants that, for a period of one year after the City's unqualified acceptance <br />of the Work in accordance with Section 1.3(b), the Work shall be free of defects in materials and <br />workmanship. The Artist will correct, at the Artist's expense, any defect that arises during such <br />period regardless of when the defect is discovered or reported to the Artist. <br />4.4 Because bronze works placed outdoors undergo natural changes in color, the artist shall <br />not be responsible for such changes in color to the Work, nor for changes consequent to the <br />City's failure to follow the written instructions for maintenance of the Work provided by the <br />Artist. Should color changes which occur within the warranty period be the result of a faulty <br />patina and/or final protective coating, the Artist shall remedy such defects. <br />ARTICLE 5 — REPRODUCTION. ALTERATION: ATTRIBUTION• INTELLECTUAL <br />PROPERTY RIGHTS <br />5.1 Reproductions of the Work <br />(a) The Artist reserves to right the have one cast of the maquette made for the Artist's <br />personal collection. If any further casts at the maquette size are desired by anyone, they may be <br />cast only upon written agreement of the City and the Artist or the Artist's Representative. <br />(b) Any other reproductions of the Work at any size may be made only upon written <br />agreement of the City and the Artist or the Artist's Representative. <br />(c) Notwithstanding the rights reserved by the Artist under Section 5.4, the City may <br />publish photographs of the Work without further approval from the Artist. Any non - <br />photographic visual representation of the Work intended for publication or distribution by the <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.